Orange County NC Website
<br />Ms. Pamela K. Janes <br />RE: Space Planning Praposal <br />B. SPACE PLANNING <br />October 31, 2007 <br />page 2 <br />Based on the information gathered for the program, ~1~e will provide floor plan ]a yTouts <br />far each department ~vithii the existing builduzg's footprint. Consideration of an <br />addition to the buildng is nat a1 ~ticipated at this time. <br />The cost far this part of the work includes the following: <br />1. ~ Investigation of existing layout and production of CADD drawings of the lst <br />and 2nd Haar plans. <br />2. Development of Hoar plan layouts and presentation tc? the departmental <br />committee far review and comment. <br />3. ReviGion of floor plans, production of cast estimates Ear the County's use in <br />establishi--g a project budget based on the approved layout, and production of <br />design and construction schedule. <br />4. Presentation of findings to Board of County Commissioners far approval, if <br />required. <br />Tl1e proposed design fee for the space plaiuling is $12,000. <br />C. TOTAL FEE: <br />The total fee proposed for the Programming and Space Planning in Phase I is $14,700. <br />PHASE II: <br />The work in Phase II will commence after review and approval of the initial work and <br />will be outlined in a separate design proposal letter in the future. Phase II would. consist <br />of the Construction Documents necessary farbicding and renovating the existing <br />building. <br />Please contact me if you have any questions or camments on the above proposal. Our <br />combined efforts a few years ago led to the successful completion anal occupancy of the Link <br />Government Services Center, and. we look forward to the opportunity to assist in adaptilg this <br />valuable facility to today's changing needs. <br />Sincere y, <br />f~ <br />nne . Redfoot, AIA <br />resident <br />KEP:es++ /link-pro <br />„"""` . <br />r r ~ CC?PLEl' REDFOOT z:1CK,,::. <br />