Orange County NC Website
.. Architectural Services p. 2 <br /> PHASE 2 cant. <br /> Prepare detailed Drawings of proposed improvements <br /> Prepare revised cost estimates <br /> Fee Allocation for Phase 2. 20; of total <br /> PHASE 3. CONSTRUCTION DOCUMENTS <br /> SCOPE: <br /> Prepare final Drawings and Specification, <br /> Secure final approval from regulatory agencies <br /> Revise cost estimates as required <br /> Fee Allocation for Phase 3. 30% of total <br /> PHASE 4. BIDDING AND CONTRACTS <br /> SCOPE: <br /> Advertise for Bids <br /> Receive Bids <br /> Prepare Contract Documents <br /> Fee Allocation for Phase 4. 5% of total <br /> PHASE 5. PROJECT CONSTRUCTION <br /> SCOPE: <br /> Supervise Construction <br /> Review Shop Drawings and other Documents <br /> Certify request for payment <br /> Verify Contractor' s performance <br /> Conduct Final Inspection at completion <br /> Prepare As-Built ,Drawings <br /> Fee Allocation for Phase 3. 20% of total <br /> Architectural Fees, estimated at 8.25% of Construction Budget, are based on <br /> schedule of standard fees for projects of similar scope and complexity, pub- <br /> lished by North Carolina Department of Administration. <br />