Browse
Search
Agenda - 01-04-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 01-04-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:51:07 AM
Creation date
6/19/2015 9:36:21 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820104
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J A M Ir S M W 9 9 B A I A A ! p .. <br /> A R C H l T E C T & P L A N N E R <br /> MEMBER AMERICAN INST;TUTE OF ARCHITECTS A'.+7 A MER -N OF PLANNERS <br /> 2 0 1 E A S T R C S E M A R <br /> T I i E P �1 v N E <br /> ARCHITECTURAL SERVICES <br /> FOR NOR"THSIDE MULTI-PURPOSE CENTER REMODELING <br /> ?RASE 1. SURVEY/PROGRAMMING/SCI[EMATIC DESIGN <br /> SCOPE: <br /> Measure existing building, prepare Drawings <br /> Examine in detail existing structural, mechanical and architectural <br /> conditions <br /> Analyze floor area use based on present occupancy <br /> Determine program requirements of various agencies housed <br /> Establish program, space allocation for anticipated occupancies <br /> List improvements required to remedy deficienciLs and to support <br /> anticipated uses and to promote operating efficiency <br /> Prepare schedule for long-range improvements program and recommend <br /> appropriate sequence for implementation <br /> Prepare preliminary cost estimates <br /> Review program with Owner <br /> Fee Allocation for Phase 1. 25% of total <br /> PHASE 2. DESIGN DEVELOPMENT <br /> SCOPE: <br /> Review program and proposed budget with Owner and Agencies served <br /> Coordinate project with code and zoning requirements and secure <br /> approvals from appropriate regulatory agencies <br /> Adjust program to incorporate review information and proposed budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.