Orange County NC Website
V.1 Providing analysts of the Owner's needs, and pro- struction, and furnishing ser%icts as may be required <br /> gramming the requirements of the Project connection with the replacement of such Work <br /> 1.7.2 Providing financial feasibility or other special 1.7.16 Providing services made necessary by the defa <br /> studies. of the Contractor, or by major defects or deficiencies <br /> 1.7.3 Providing planning surveys, site evaluations, envi- the Work of the Contractor, or by failure of performar <br /> ronmental studies or comparative studies of prospective of either the Owner or Contractor under the Contract <br /> Construction <br /> sites, and preparing special surveys, studies and submis- <br /> sions required for approvals of governmental authorities 1.7.17 Preparing a set of reproducible record dr,,�%ir <br /> or others having jurisdiction over the Project.. showing significant changes in the Work made duri <br /> construction based on marked-up prints. dratvings a <br /> 1.7,4 Providing services relative to future facilities, Sys- other data furnished by the Contractor to the Architect. <br /> tems and equipment which are not intended to be con- 1 716 Providing extensive assistance in the utilization <br /> structed during the Construction Phase. <br /> any equipment or system such as initial start-tap or tests <br /> 1,75 Providing services to investigate existing conditions adjusting and balancing, preparation of operation a <br /> or facilities or to make measured drawings thereof. or to maintenance manuals, training personnel for oprrati <br /> verify the accuracy of drawings or other information fur- and maintenance, and consultation during operation <br /> nfshed by the Owner. 1.7.19 Providing services after issuance to the Owner <br /> 1.7,6 Preparing documents of alternate, separate or ' , the final Certificate for Payment, or in the absence o <br /> sequential bids or providing extra services in connection final Certificate for Payment, more than sixty days of <br /> Date bidding, negotiation or construction prior to the the ate of Substantial Completion of the Work. <br /> completion of the Construction Documents Phase, when 1,7.20 Preparing to serve or serving as an expert wit, <br /> requested by the Owner. <br /> in connection with any public hearing, arbitration p <br /> 1.7.7 Providing coordination of Work performed by ceeding or legal proceeding. <br /> separate contractors or by the Owners own forces. 1,7,21 Providing services of consultants for other tl <br /> 1.7.6 Providing services in connection with the work of the normal architectural, structural, mechanical and el <br /> a construction manager or separate consultants retained trical engineering services for the Project. <br /> by the Owner 1.7.22 Providing any other services not othentiise <br /> 1.7.9 Providing Detailed Estimates of Construction Cost, eluded in this Agreement or not customarily furnisher, <br /> analyses of owning and operating costs, or detailed quan- accordance with generally accepted architectural practi <br /> tity surveys or inventories of material, equipment and 1,3 TIME <br /> labor. 1.8.1 The Architect shall perform Basic and Additio <br /> 1,7.10 Providing interior design and other similar ser- Services as expeditiously as is consistent with professio <br /> vices required for or in connection with the selection, skill and care and the orderly progress of the Work. Up <br /> procurement or installation of furniture, furnishings and request of the Owner, the Architect shall submit for <br /> related equipment. Owner's approval, a schedule for the performance of I <br /> 1,7,11' Providing services for planning tenant or rental Architect's services stihich shall be adjusted as required <br /> spaces, the Project proceeds,and shall include allowances for pE <br /> 1.7,11 Malting revisions in Drawings, Specifications or ods of time required for the Owner's review and appro <br /> other documents when such revisions are inconsistent of submissions and for approvals of authorities hav, <br /> with written approvals or instructions previously given, jurisdiction o\er the Project. This schedule, hen appraN <br /> by the Owner, shalt not. except for reasonable cause, <br /> are required by the enactment or revision of codes, lass exceeded by the Architect, <br /> or regulations subsequent to the preparation of such doc- <br /> uments or are due to other causes not solely within the <br /> control of the Architect. ARTICLE 2 <br /> 1.7.13 Preparing Drawings, Specifications and supporting THE OWNER'S RESPONSIBILITIES <br /> data and providing other services in connection with <br /> Change Orders to the extent that the adjustment in the 21 The Owner shall provide: full information regardi <br /> Basic Compensation resulting from the adjusted Con- requirements for the Project :ncluding a program. �,,hi <br /> struction Cost is not commensurate with the services re- shall set forth the Owner's design objectives. constraii <br /> quired of the Architect, provided such Change Orders are and criteria, including space requirements and relatic <br /> required by causes not solely within the control of the ships, flexibility and expandability, special equipment a <br /> Architect systems and site requirements <br /> 1.7.14 ,Making investigations, surveys, valuations, inven- 2.2 if the Owner provides a budget for the Project <br /> tories or detailed appraisals of existing facilities, and serv- shall include contingencies for bidding, 'chan,es in t <br /> ices required in connection with construction performed Work during construction, and other costs S%hich are t <br /> by the Owner. responsibility of the Owner, including those described <br /> this Article 2 and in Subparagraph 3 1 2. The O%tiner sh~ <br /> ~` 1.7.15 Providing consultation concerning replacement of at the request of the Architect, provide a statement <br /> any Work damaged by fire or other cause during con- funds available for the Project, and their source. <br /> AIA DOCUMENT alai r owNER•ARCHITECT AGREE LENT • THIR€EEVTH EDITION• JULY 191i 4 A,A& • �D i477 <br /> THE AMERICAN INSTITUTE Of ARCHITECTS- 17)5 NEW YORK AVENIA, NW. WASHINGTON, d.C.. ZOW6 B141-1977 <br />