								    				TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT
<br />    						ARTICLE ?  				meats to previcuS Statements of Probable C:onstructi
<br />  			ARCHITECT'S SERVICES AND  RESPONSIBILITIES	Cost indicated by changes in  requirements or gene
<br />     												market conditions.
<br />			BASIC: SERVICES							1.3.4  The Architect shall assist the O:vner in connecth
<br />      			The Architect's  Basic Service$  consist  of  the  rive       with the Owner's responsibility for filing documents r
<br />      			phases described in Paragraphs 11 through 15 and       quired for the approval of governmental authorities ha
<br />      			include normal structural, mechanical and electrical       Ing jurisd;.:Iion over the Project.
<br />      			engineering services and any other services included       1A  BIDDING OR NEGOTIATION PHASE
<br />      			In Article 15 as part of Basic Services.  			1,4.1   The ,architect, iollowin   the Owner's s a pprova[ t
<br /> 			1,1  SCHEMATIC DESIGN PHASE      				the Construction Documents and of the latest Statemet
<br />			1.1.1   The Architect shall review the program furnished       of Probable Construction Cost, shall assist the Owner
<br />			by the Owner to ascertain the requirements of the Project       obtaining  bids or  negotiated  proposals,  and  assist
<br />			and shall review the understanding of such requirements       awarding and preparing contracts for construction
<br />			with the Owner.							1.,5  CONSTRUCTION PHASE--ADMINISTRATION
<br />       		1.1,2   The Architect shall provide a preliminary evalua-     	OF THE CONSTRUCTION CONTRACT
<br />       		tion of the program and the Project budget requirements
<br />       		each in terms of the other, Subject to the limitations set,       7,5.7   The Construction Phase will commence with If
<br />    												award of the Contract for Construction an      g
<br />      																		d, together wi
<br />       		Earth in Subparagraph 3.2.1.   					the Architect's obligation to provide Basic Services and
<br />       		7.7.3   The Architect shall review with the Owner alterna-       this Agreement, will terminate when final payment to 0
<br />       		tive approaches to design and construction of the Project.       Contractor is due, or in the absence of a final Certifica
<br />       		1.1.4   Based on the mutually agreed upon program and       for Payment or of such due date,'sixty days after the Da
<br />       		Project budget requirements, the Architect shall prepare,       of Substantial Completion of the Work, whichever occu
<br />       		for approval by the Owner, Schematic Design Documents       first.
<br />       		consisting of drawings and other documents illustrating       1.5,2   Unless otherwise provided in this Agreement an
<br />       		the scale and relationship of Project components  		incorporated in the Contract Documents, the Archiie+
<br />      		1.1.5   The Architect shall submit to the Owner a State-       shall provide administration of the Contract for Construe
<br />       		ment of Probable Construction Cost  based on current       lion as set forth below and in the edition of AIA Docu
<br />       		area, volume or other unit costs,     				men( A201, General Conditions of the Contract for Con
<br />       		1.2  DESIGN DEVELOPMENT PHASE    				siruction, current as of the date of this Agreement.
<br />       		1.2.1   Based on the approved Schematic Design Docu-       1,5.3   The Architect shall  be a  representative  of  the
<br />       		tents and any adjustments authorized by the Owner in       Owner during the Construction Phase, and shall advist
<br />   												and consult NYi[h the p
<br />       		the program or Project budget, the Architect shall   re- 				Owner. Instructions to the Cantrac
<br />       										fa  	for shall be forwarded through the Architect The Archi
<br />       		pare, for approval by the Owner, (design Development       tect shall have authority to act on behalf of the Ownei
<br />       		Documents consisting of drawings and other documents       only to the extent provided in the Contract Documents
<br />       		to fix and describe the size and character of the entire       unless otherwise modified by written inwurnent in ac,
<br />       		Project as to architectural.structural,mechanical and efec-       cordance with 5ubparagraph '1.516,
<br />       		trical systems, materials and such other elements as may
<br />       		be appropriate  							1.5.4   The Architect shall visit the site at inter%als ap-
<br />  												propriate The ArclliteC! shall submit to the Owner a further       propriate to the stage of construction or as otherwise
<br />      		1.2-emeni of Probable Architect s Construction Cost,  			agreed by the Architect in writing to become generally
<br />  												familiar with the progress and quality of the Work and to
<br />      		1.3  CONSTRUCTION DOCUMENTS PHASE    			determine in general if the Work, is proceeding in accord-
<br />      		1.3,1   Based on the approved Design Development Doc-       ance with the Contract Documents. however, the Archi-
<br />  												tect shall not be required to make exhaustive or con-
<br />      		uments and any further adjustments in the scope or goal-       sinuous on-site inspections to check the quality or quan-
<br />      		ity of the project or in the Project budget authorized by       City of the Wark. On the basis of such on-site obsena-
<br />      		the Owner, the Architect shall prepare, for approval by       tions as an architect, the Architect shall keep the Owner
<br />      		the Owner, Construction Documents consisting of Draw-       informed of the
<br />     		ings and Specifications setting forth in derail the require-    			progress and quality of the Work, and
<br />     		men#s for the construction of the Project  			shah endeavor to guard the Owner against defects and
<br />     		1.3.2   The Architect shall assist the Owner in the prepara-       deflGlencies in the work of the Contractor,
<br />  													The Architect shall not have control or charge of
<br />     		Lion of the necessary bidding information, bidding forms.       1.5,5
<br />     		the Conditions of the Contract, and the faun of Agree_       and  shall  not  be responsible  for construction  means,
<br />     		tent between the Owner and the Contractor,     		methods, techniques, sequences or procedures,  or for
<br /> 												safety precautions and programs in connection with the
<br />     		1,3.3   The Architect shall advise the Owner of any adjust-       Work, for the acts or omissions of the Contractor, Sub-
<br />     		AIA DOCUMENT 8141 - OWNER-ARCHITECT AGREEMEI'T- THIRE TEE�7H iDIPON • JULY 99., 9 AIAO. (11"717
<br />     		THE AMERfCAN tNSTtTUTE OF ARCHItECTS, 1735 NEW YORK AVENUE, NW, wASHtNGTON, DC  2CW6 			8141-1977  3