Orange County NC Website
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE ? meats to previcuS Statements of Probable C:onstructi <br /> ARCHITECT'S SERVICES AND RESPONSIBILITIES Cost indicated by changes in requirements or gene <br /> market conditions. <br /> BASIC: SERVICES 1.3.4 The Architect shall assist the O:vner in connecth <br /> The Architect's Basic Service$ consist of the rive with the Owner's responsibility for filing documents r <br /> phases described in Paragraphs 11 through 15 and quired for the approval of governmental authorities ha <br /> include normal structural, mechanical and electrical Ing jurisd;.:Iion over the Project. <br /> engineering services and any other services included 1A BIDDING OR NEGOTIATION PHASE <br /> In Article 15 as part of Basic Services. 1,4.1 The ,architect, iollowin the Owner's s a pprova[ t <br /> 1,1 SCHEMATIC DESIGN PHASE the Construction Documents and of the latest Statemet <br /> 1.1.1 The Architect shall review the program furnished of Probable Construction Cost, shall assist the Owner <br /> by the Owner to ascertain the requirements of the Project obtaining bids or negotiated proposals, and assist <br /> and shall review the understanding of such requirements awarding and preparing contracts for construction <br /> with the Owner. 1.,5 CONSTRUCTION PHASE--ADMINISTRATION <br /> 1.1,2 The Architect shall provide a preliminary evalua- OF THE CONSTRUCTION CONTRACT <br /> tion of the program and the Project budget requirements <br /> each in terms of the other, Subject to the limitations set, 7,5.7 The Construction Phase will commence with If <br /> award of the Contract for Construction an g <br /> d, together wi <br /> Earth in Subparagraph 3.2.1. the Architect's obligation to provide Basic Services and <br /> 7.7.3 The Architect shall review with the Owner alterna- this Agreement, will terminate when final payment to 0 <br /> tive approaches to design and construction of the Project. Contractor is due, or in the absence of a final Certifica <br /> 1.1.4 Based on the mutually agreed upon program and for Payment or of such due date,'sixty days after the Da <br /> Project budget requirements, the Architect shall prepare, of Substantial Completion of the Work, whichever occu <br /> for approval by the Owner, Schematic Design Documents first. <br /> consisting of drawings and other documents illustrating 1.5,2 Unless otherwise provided in this Agreement an <br /> the scale and relationship of Project components incorporated in the Contract Documents, the Archiie+ <br /> 1.1.5 The Architect shall submit to the Owner a State- shall provide administration of the Contract for Construe <br /> ment of Probable Construction Cost based on current lion as set forth below and in the edition of AIA Docu <br /> area, volume or other unit costs, men( A201, General Conditions of the Contract for Con <br /> 1.2 DESIGN DEVELOPMENT PHASE siruction, current as of the date of this Agreement. <br /> 1.2.1 Based on the approved Schematic Design Docu- 1,5.3 The Architect shall be a representative of the <br /> tents and any adjustments authorized by the Owner in Owner during the Construction Phase, and shall advist <br /> and consult NYi[h the p <br /> the program or Project budget, the Architect shall re- Owner. Instructions to the Cantrac <br /> fa for shall be forwarded through the Architect The Archi <br /> pare, for approval by the Owner, (design Development tect shall have authority to act on behalf of the Ownei <br /> Documents consisting of drawings and other documents only to the extent provided in the Contract Documents <br /> to fix and describe the size and character of the entire unless otherwise modified by written inwurnent in ac, <br /> Project as to architectural.structural,mechanical and efec- cordance with 5ubparagraph '1.516, <br /> trical systems, materials and such other elements as may <br /> be appropriate 1.5.4 The Architect shall visit the site at inter%als ap- <br /> propriate The ArclliteC! shall submit to the Owner a further propriate to the stage of construction or as otherwise <br /> 1.2-emeni of Probable Architect s Construction Cost, agreed by the Architect in writing to become generally <br /> familiar with the progress and quality of the Work and to <br /> 1.3 CONSTRUCTION DOCUMENTS PHASE determine in general if the Work, is proceeding in accord- <br /> 1.3,1 Based on the approved Design Development Doc- ance with the Contract Documents. however, the Archi- <br /> tect shall not be required to make exhaustive or con- <br /> uments and any further adjustments in the scope or goal- sinuous on-site inspections to check the quality or quan- <br /> ity of the project or in the Project budget authorized by City of the Wark. On the basis of such on-site obsena- <br /> the Owner, the Architect shall prepare, for approval by tions as an architect, the Architect shall keep the Owner <br /> the Owner, Construction Documents consisting of Draw- informed of the <br /> ings and Specifications setting forth in derail the require- progress and quality of the Work, and <br /> men#s for the construction of the Project shah endeavor to guard the Owner against defects and <br /> 1.3.2 The Architect shall assist the Owner in the prepara- deflGlencies in the work of the Contractor, <br /> The Architect shall not have control or charge of <br /> Lion of the necessary bidding information, bidding forms. 1.5,5 <br /> the Conditions of the Contract, and the faun of Agree_ and shall not be responsible for construction means, <br /> tent between the Owner and the Contractor, methods, techniques, sequences or procedures, or for <br /> safety precautions and programs in connection with the <br /> 1,3.3 The Architect shall advise the Owner of any adjust- Work, for the acts or omissions of the Contractor, Sub- <br /> AIA DOCUMENT 8141 - OWNER-ARCHITECT AGREEMEI'T- THIRE TEE�7H iDIPON • JULY 99., 9 AIAO. (11"717 <br /> THE AMERfCAN tNSTtTUTE OF ARCHItECTS, 1735 NEW YORK AVENUE, NW, wASHtNGTON, DC 2CW6 8141-1977 3 <br />