Browse
Search
ORD-2015-016 Ordinance Amending the Orange County UDO to incorporate a State recognized process allowing for the placement of additional impervious surface as set out
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2015
>
ORD-2015-016 Ordinance Amending the Orange County UDO to incorporate a State recognized process allowing for the placement of additional impervious surface as set out
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 10:10:47 AM
Creation date
6/17/2015 10:16:20 AM
Metadata
Fields
Template:
BOCC
Date
6/16/2015
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5a
Document Relationships
Agenda - 06-16-2015 - 5a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 06-16-2015 - Regular Mtg.
Minutes 06-16-2015
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4: Overlay Zoning Districts <br /> Section 4.2: Watershed Protection <br /> 4.2.5 Impervious Surface and Detention Pond Requirements for Residential Uses <br /> IMPERVIOUS . POND REQUIREMENTS <br /> DISTRICT IMPERVIOUS SURFACE/DETENTION REQUIREMENTS(RESIDENTIAL) <br /> 6% impervious surface limit. <br /> EXCEPT for all lots which existed prior to 4/2/90,which are subject to impervious surface <br /> limits as provided in the following Table(entitled Sliding Scale for Residential Impervious <br /> Surface Ratios—Univ, Cane,and Little). [1]_-0 Bnnp Gann woe used to <br /> , ., , satisfy watershed <br /> UNIV-CA . eus surf@Ge Feg1 ,"„P_, .. ' <br /> UNIV-PW Lots shall either be a minimum of 2 acres in area exclusive of any right-of-way or access <br /> easement,or created in accordance with established density regulations through the <br /> subdivision process to qualify for additional impervious surface allocation as detailed in <br /> Section 4.2.8(C). <br /> 6% impervious surface limit. <br /> EXCEPT for lots smaller than two acres which existed prior to 1/1/94,which are subject to <br /> impervious surface limits as provided in the following Table(entitled Sliding Scale for <br /> Residential Impervious Surface Ratios—Univ, Cane, and Little). [1],[21 <br /> CANE-CA * onnoS . t be used to satisfy + <br /> h d ,.+r M + <br /> CANE-PW Lots shall either be a minimum of 2 acres in area exclusive of any right-of-way or access <br /> easement or created in accordance with established density regulations through the <br /> subdivision process to qualify for additional impervious surface allocation as detailed in <br /> Section 4.2.8(C). <br /> 6%impervious surface limit. <br /> EXCEPT for lots smaller than five acres which existed prior to 6/1/2010,which are subject to <br /> U-ENO-CA impervious surface limits as provided in the following Table(entitled Sliding Scale for <br /> Residential Impervious Surface Ratios—Upper Eno). [11, r21 <br /> 6%impervious surface limit. <br /> EXCEPT for lots which existed prior to 1/1/94, which are subject to impervious surface limits <br /> as provided in the following Table(entitled Sliding Scale for Residential Impervious Surface <br /> Ratios-Univ, Cane, and Little). [11, [21 <br /> LITTLE-PW * RAAP;Gannet be used to satisfy watershed impewieus ,•r <br /> Lots shall either be a minimum of 2 acres in area exclusive of any right-of-way or access <br /> easement, or created in accordance with established density regulations through the <br /> subdivision process to qualify for additional impervious surface allocation as detailed in <br /> Section 4.2.8(C). <br /> 1 Staff is editing existing notes throughout the Section to address existing typographical and reference errors. In <br /> the existing text an asterisk(") in certain cases was used to denote information while in other cases it was not. <br /> There was also a [1] used to identify certain watersheds requiring a BMP in the Neuse River Basin. Unfortunately <br /> the watershed overlay districts identified are not in the Neuse River Basin. The proposed amendments address <br /> these issues and clarify the essential information. <br /> z Green bold underlined language added on May 28,2015 to address a concern of the Planning Director. <br /> Specifically lots created through the cluster subdivision process would not be able to take advantage of the <br /> proposal. We also changed out the term'parcel'for'lot'as the term 'lot'is already defined within the UDO. <br /> S Staff is suggesting language mandating a 2 acre minimum lot size, or that the lot was created in accordance with <br /> established density regulations, in order for a parcel within identified watershed overlay districts to request a <br /> modification of impervious surface area through the installation of a stormwater feature.The rationale for the <br /> suggestion is that State regulations currently allow governing bodies to require either a 1 acre minimum lot size, <br /> limited to a 6%impervious surface threshold, or a 2 acre minimum lot size limited to a 12%impervious surface <br /> threshold. In these identified watershed overlay districts the County made a conscious decision to follow the more <br /> restrictive option. We are recommending the condition to ensure those properties subject to a modification <br /> request meet minimum State standards with respect to required lot size. Please refer to Attachment 2 for <br /> additional information on State requirements associated with the establishment and enforcement of impervious <br /> surface thresholds. <br /> Orange County, North Carolina—Unified Development Ordinance Page 4-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.