Orange County NC Website
68 <br /> for possible rock. The topography of the neighborhood is complex and the land falls in <br /> several different directions. This concept plan does not include the costs of any property <br /> acquisitions or easement acquisitions. The availability hookup charge for each of the <br /> parcels is based on an assumed average house size of 2,500 square feet. When a <br /> customer connects to the OWASA water and sewer system, there is a one-time fee that <br /> is estimated to be $4,300 per parcel for the concept plan. <br /> Cost estimate Summary: <br /> Engineering, Design and Permitting 376,350 <br /> Construction Cost 3,763,506 <br /> Construction Administration 188.175 <br /> Construction Inspection 188,175_ <br /> 20%Contingency 903,241 <br /> Sub Total 5,419,447 <br /> Service Availability Fees 368,768 <br /> Total 5,788,215 <br /> The concept does not include the cost to actually connect individual homes to the sewer <br /> system. Those costs will vary depending on the configuration of the lot and the distance <br /> from the house to the main sewer line. Those costs are typically the costs of the <br /> homeowner and are estimated to be about $20 1foot. The connections to an individual <br /> house would be provided by a private plumbing contractor. <br /> 6 <br />