Browse
Search
Agenda - 11-21-2013 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-21-2013 - Assembly of Governments
>
Agenda - 11-21-2013 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 2:56:11 PM
Creation date
6/16/2015 1:51:44 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 11-21-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67 <br /> have not connected. The 86 parcels in yellow are the properties that would be served <br /> by the conceptual sewer layout. The concept map also breaks down the sewer service <br /> into 8 sub-areas with the number of parcels served and cost per parcel. The 8 red lines <br /> represent the possible sub-areas of the sewer infrastructure that could be considered, if <br /> the entire concept project is not feasible. The sewer infrastructure routing was estimated <br /> based on the topography taken from maps rather than from any field work. In 'Order to <br /> get to a greater level of detail or certainty- on the cost, some field work would be <br /> required. There are two brown areas on the map that the County has identified as some <br /> subsurface disposal or some suspected contamination. Without any further <br /> investigation, the sewer line has been routed no closer than 100 feet of that margin. <br /> Exhibit 2 <br /> Historic Rogers grad`Araa, r on _ ;-- <br /> May 2012 <br /> T <br /> -- <br /> Pa,cell Cast Per <br /> \ Area efial Cost ' Served a ceE <br /> S $468,750 1 2 —$234,390 <br /> £ 2 $756;234 I 6 $131,639 €.. <br /> n-.. 106,313 �. 51(16 315 <br /> \ 4 $546,960 <br /> 5, 5826;022 17 848,590 <br /> awm xt tt <br /> a 8 �sno m l { $848,919 �r 169,784 <br /> h � i <br /> 7 3::4°,191 2 $ 74,56 }; <br /> $1,555.900 45 $42 24 <br /> Total $5,788,217 86 $67,30P <br /> fj37 £ jp <br /> 1 - Flr,aiERwnrxsGMp} + <br /> tr <br /> s <br /> Jl 02) <br /> y y 0may <br /> r , <br /> The total construction and installation cost for the sewer concept is current estimated to <br /> be $5.8 million. See the table below. It would serve 86 additional parcels of land. The <br /> concept costs include construction, engineering design, administration and contingency <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.