Orange County NC Website
------ 57 <br /> this fee does not cover the service lines because those are typically installed at the developer's <br /> expense). This fee would be paid at the same time as QWWASA's availability fee — When a <br /> connection is made. The District's policy could provide that the service line extension fee would <br /> be waived for the first-connection made to any property existing as of a specified date. <br />