Orange County NC Website
49 <br /> Exhibit 5 <br /> Print file(Ctrl+P) <br /> Nigh Cost Areas A <br /> � 3 <br /> LOTS <br /> HLw9le Tfdc[ <br /> (9rdn9e CvM1Y7 GRene Trod <br /> I' _ � c❑ 1 L <br /> I <br /> I <br /> AREA 7 <br /> 5LOT5 <br /> i- <br /> G2 Tr= <br /> [ddA OmdslilP] <br /> tN <br /> i <br /> i r <br /> it <br /> 4. <br /> ar <br /> r <br /> 6 <br /> M.— <br /> _ r eKn-gym - <br /> 5 <br /> The 2012 Sewer concept presented by OWASA had a total estimated cost of $5.8 <br /> million that would serve 86 parcels, with an average cost of $67,000 per parcel. The <br /> Proposed Utility District which evolved from the 2012 Sewer concept has an estimated <br /> total cost of $17.6 million. With an expanded service area, the cost of sewer only is <br /> $11.6 million. If the sewer component of the Proposed Utility District is broken out, <br /> sewer would serve 220 sewer parcels, with an average cost of$53,131 per parcel. <br /> 13 <br />