Browse
Search
Agenda - 11-21-2013 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-21-2013 - Assembly of Governments
>
Agenda - 11-21-2013 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 2:56:11 PM
Creation date
6/16/2015 1:51:44 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 11-21-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br /> All parcels that already have access to water and/or sewer on the maps are identified in <br /> a black crosshatch; some of these parcels are currently connected to OWASA's system <br /> and some are not. <br /> The Proposed Utility District would extend water and sewer to all parcels within the <br /> purple boundary. The newly Proposed Utility District almost doubles the amount of <br /> sewer that would need to be installed from what was proposed in May 2012. This <br /> expanded area increased the lineal feet of sewer extension required from 3.6 miles to <br /> 6.8 miles and added 4.4 miles of water main extension. The conceptual layouts for <br /> sewer and water are based on the parcel boundaries as they are currently configured <br /> and whether or not a structure or multiple structures are currently located on a parcel <br /> was not considered. <br /> The Proposed Utility District includes all parcels and the cost per parcel in some areas <br /> will be much greater than others. Exhibit 5 (High Cost Areas) identifies 5 areas where <br /> the cost of new water and/or sewer infrastructure/parcel will be the highest. If the high <br /> cost areas are removed until additional development occurs in the Proposed Utility <br /> District the initial cost of the Utility District would go from $17.6 million to $13.4 million. <br /> This represents a 24% decrease in the initial cost, which could be the final phase of the <br /> Utility District, and would eliminate water and/or sewer service to 22 parcels. The cost <br /> for the High Cost Areas is outlined below: <br /> Proposed Utility District Less High Cost Areas <br /> Total Water Cost Less High Cost Areas <br /> Total Overall Cost for Water $ 5,991,251 <br /> Minus High Cost Areas for Water $ 1,826,331 <br /> Total Water $ 4,164,920 <br /> Total Sewer Cost Minus High Cost Areas <br /> Total Overall CostforSewer $ 11,688,811 <br /> Minus High Cost Areas for Sewer $ 2,465,767 <br /> Total Sewer $ 9,223,044 <br /> Total Water& Sewer Cost Minus High Cost Areas $ 13,387,964 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.