Orange County NC Website
Proposed District <br /> Total • <br /> Construction Cost <br /> Design and Permitting 10% $ 383,572 <br /> Construction Administration :. <br /> Construction Inspection :. <br /> 1'. Contingency $ 920,575 <br /> • Total 5,523,443 <br /> Availability Service 441,408 <br /> Meter Cost $ 26,400 <br /> • <br /> Number of parcels served <br /> Cost Per Parcel $ 45,388 <br /> Exhibit <br /> Water • Y! _ <br /> 1 <br /> 7 <br /> � �� 111!1► � � ' <br /> ��1_�■-������ ��� �,�� � �� ���� is <br /> ► �� <br />