Browse
Search
Agenda - 11-21-2013 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-21-2013 - Assembly of Governments
>
Agenda - 11-21-2013 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 2:56:11 PM
Creation date
6/16/2015 1:51:44 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 11-21-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 <br /> The Proposed Utility District above is broken down between Water and Sewer Costs. <br /> The Total Cost of the proposed Utility District is outlined below: <br /> Proposed Utility District <br /> Total Water and Sewer Cost <br /> Construction Cost $ 11,226,913 <br /> Engineering, Design and Permitting 10% $ 1,122,691 <br /> Construction Administration 5% $ 561,346 <br /> Construction Inspection 5% $ 561,346 <br /> 20%Contingency $ 2,694,459 <br /> Sub Total $ 16,166,755 <br /> Service Availability Fees $ 1,414,908 <br /> Meter Cost $ 26,400 <br /> Tota 1 $ 17,608,063 <br /> Cost Per Parcel (220) $ 80,037 <br /> The Sewer only cost estimate is outlined below and shown on Exhibit 3 (Sewer Map). <br /> Existing OWASA-owned public sewer is shown in thin green lines. The Proposed Utility <br /> District for sewer infrastructure is shown with a thick red line with black dots, <br /> representing the manholes for the new extension. <br /> Proposed Utility District <br /> Total Sewer Cost <br /> Construction Cost $ 7,441,188 <br /> Engineering, Design and Permitting 10% $ 744,119 <br /> Construction Administration 5% $ 372,059 <br /> Construction Inspection 5% $ 372,059 <br /> 20%Contingency $ 1,785,886 <br /> Sub Total $ 10,715,311 <br /> Service Availability Fees $ 973,500 <br /> Total $ 11,688,811 <br /> Number of parcels served 220 <br /> Cost Per Parcel $ 53,131 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.