Orange County NC Website
21 <br /> Community Design Workshop <br /> For the Task Force to further develop its vision, the Town contracted with the Durham From the analysis of the different schemes developed at the design workshop,the <br /> Area Designers (DAD)to host a workshop in the Summer of 2008.The information Urban Design Assistance Team proposed a plan for both land use and open space <br /> from early Task Force meetings provided a foundation for this interactive process.The as well as written recommendations.This work was presented to the task force and <br /> community design workshop was on Saturday,June 7, 2008.The objective was to find a workshop attendees at a meeting on July 31, 2008, at which time the findings and the <br /> community consensus for components of the proposed small area plan. proposed land use plan were presented for discussion and approval.The final land use <br /> plan (Figure 9)and recommendations are presented in the next section. <br /> The Components of a small area plan include: <br /> • Land use guidelines <br /> • Appearance guidelines <br /> •An expanded multi-modal transportation network <br /> • Infrastructure improvements <br /> • Community development strategies <br /> The workshop included a presentation describing the community and introduced tools <br /> and concepts for use during the workshop. Attendees divided into three teams desig- <br /> nated A, B, and C.Two members of the DAD Urban Design Assistance Team were at each <br /> team table to facilitate the work and provide design assistance for visualizing the team <br /> a . . <br /> members' ideas. <br /> The workshop included two design sessions at which each team developed ideas.These r <br /> ideas included a new road and trail network, suggestions for types of development in <br /> specific areas of the community, and plans for preservation of Rogers Road's unique <br /> cultural heritage. After each of the design sessions, each team shared its ideas with the <br /> group.This process allowed ideas to become the property of each team as it molded its <br /> conceptual plan of future development in the Rogers Road community.The individual <br /> plans developed by each team are included in Figure 8 on page 16. <br /> a . <br />