Browse
Search
Agenda - 06-16-2015-13 (9)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 06-16-2015 - Regular Mtg.
>
Agenda - 06-16-2015-13 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2015 11:59:38 AM
Creation date
6/15/2015 10:12:32 AM
Metadata
Fields
Template:
BOCC
Date
6/16/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
13-9
Document Relationships
Minutes 06-16-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Attachment 2 -203 S. Greensboro Preliminary Phase Due Diligence <br /> ;•db <br /> AS <br /> i� <br /> VT �`� � <br /> y � b <br /> 1.8857932 m <br /> Z <br /> Z <br /> w "s <br /> 1 <br /> ,� E CpF2Ft SY Town of Carrboro <br /> 0.89 acres <br /> N GARB ST - <br /> F �a <br /> Background <br /> The .89 acre Century Center is owned by the Town of Carrboro and is currently utilized as a public <br /> parking lot. <br /> The parcel was submitted for consideration and evaluation as a library site by the Carrboro Town Board <br /> on May 10, 2013. Staff had studied the parcel in accordance with established library site evaluation <br /> criteria and initially determined potential benefits, with respect to the development and/or use of the <br /> property, were outweighed by identified benefits constraints including: <br /> a. Proximity to existing residences creating issues for property owners (i.e. noise, traffic, congestion, <br /> etc.) <br /> b. Cost of construction, <br /> c. Traffic impacts, <br /> d. Limits of expansion opportunities. <br /> After having additional discussions with the Town of Carrboro, which included the review of a previously <br /> approved development proposal for the site and Carrboro staff's assurances over potential development <br /> of satellite parking to support a library, staff is re-evaluating the property. <br /> Buildable area on the parcel is estimated to be at approximately 30,000 square feet. With the <br /> construction of a single level structure, staff estimates a 15,000 square foot library structure, with adjacent <br /> surface parking for approximately 50 vehicles, may be achieved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.