Orange County NC Website
M anager's Recommended Fee Schedule- FY 2015-16 25 <br /> Manager's Recommended Fee Last <br /> Department/Program Description Current Fee Schedule for FY 2015-16* Revision <br /> Erosion Control Fees Erosion Control Plan Review <br /> Intense urban $507.00 per acre 2001 <br /> Urban $272.00 per acre 2001 <br /> Rural $158.00 per acre 2001 <br /> Land Disturbance(Grading)Permits <br /> Intense Urban $1,241.00 per acre 2001 <br /> Urban $646.00 per acre 2001 <br /> Rural $310.00 per acre 2001 <br /> Private Roads $155.00 1998 <br /> Storm water Management Plans $500.00 2011 <br /> Stream Origin and Intermittent/Perennial <br /> Determinations <br /> 1-2 determinations/site$200 <br /> 3-6 determinations/site$500 <br /> 7-9 determinations/site$10 00 <br /> 10-12 determinations/site$1200 <br /> 13-16 determinations/site$1500 <br /> Surface Water Identification SWID fieldwork. 17-19 determinations/site$2000 2012 <br /> Flat fee of$10,000 for projects less than 5 <br /> Infill/redevelopment acres.5 acres or greater use intense urban 2011 <br /> Inspection fees <br /> Building Schedule <br /> New Residential 1&2 family) $0.357/s q.ft. all trades included 2014 <br /> Building 0.145/s.ft. 2014 <br /> Electrical 0.067/s q.ft. 2014 <br /> Pl=bing 0.067/s q.ft. 2014 <br /> Mechanical 0.078/s q.ft. 2014 <br /> 0.184/sq.ft.$10.00 min.12%surcharge for <br /> Plan Review Hillsboro 2014 <br /> Schedule B <br /> Residential Renovations and Accessory Structures <br /> 1&2 larnily $0.23 per square foot 2006 <br /> Building 0.265/s q.ft. 2014 <br /> Electrical $75.00 2014 <br /> Plum $75.00 2014 <br /> Mechanical $75.00 2014 <br /> 0.184/sq.ft.$15.00 min.12%surcharge for <br /> Plan Review Hillsboro 2014 <br /> * Any fee changes wi I I be included in this column; <br /> a bl ank besi de each f ee means there i s no f ee change i n FY 2015-16 Manager Recommended Fee Schedule <br />