Browse
Search
Agenda - 06-16-2015 - 6m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 06-16-2015 - Regular Mtg.
>
Agenda - 06-16-2015 - 6m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2015 11:38:39 AM
Creation date
6/15/2015 9:37:31 AM
Metadata
Fields
Template:
BOCC
Date
6/16/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6m
Document Relationships
Minutes 06-16-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: June 16, 2015 <br /> Action Agenda <br /> Item No. 6-m <br /> SUBJECT: Authorization for County Manager to Award Buckhorn Mebane Sewer Phase 2 <br /> Extension Construction Contract and Professional Services Agreement <br /> DEPARTMENT: Planning PUBLIC HEARING: (Y/N) NO <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Maps Showing Approved Scope of Howard W. Fleming, Jr., PE, <br /> Project Engineering/Stormwater Supervisor, <br /> 245-2586 <br /> Craig Benedict, Planning Director, 245- <br /> 2592 <br /> James Bryan, Staff Attorney, 245-2319 <br /> PURPOSE: To consider authorizing the Manager to- <br /> 1) Award the bid and, upon County Attorney review, execute the construction contract for <br /> the Buckhorn Mebane Phase 2 Sewer Extension project during the summer break in an <br /> amount not to exceed the project budget; <br /> 2) Execute, upon County Attorney review, a services contract with an engineering firm over <br /> the summer break for construction contract administration and engineering inspections <br /> within the project budget; and <br /> 3) Approve project change orders that do not in total exceed the project budget. <br /> BACKGROUND: This project has been approved and is part of the County's current Capital <br /> Projects budget for 2014-2015. Once complete, the infrastructure installed as part of this <br /> project will connect the Efland Sewer system to the City of Mebane's sewer system and <br /> wastewater treatment. Ownership and operation of the Efland Sewer system will then be <br /> transferred to the City of Mebane consistent with an existing interlocal agreement with the City. <br /> This will eliminate the County's yearly maintenance cost for the Efland sewer system. <br /> In addition, this project makes possible gravity sewer service to a large economic development <br /> area south of the Norfolk Southern railroad tracks that run through the Efland community (see <br /> Attachment). Approximately 250 acres will drain to the gravity sewer lines laid as part of this <br /> project. The location of the new pump station installed as part of this project will allow future <br /> gravity sewer service to an additional 450 acres (for a total of 700 acres), but the gravity sewer <br /> lines to serve this additional area are not a part of this project. <br /> The project base bid consists of a short extension of the Efland Sewer system force main, <br /> 7,287 linear feet (LF) of gravity sewer, a new pump station and almost 20,000 LF of sewer force <br /> main to connect this new pump station to the City of Mebane's sewer system. The new force <br /> main will follow West Ten Road, turn to follow Bowman Road and will ultimately connect into the <br /> recently completed gravity sewer system at the intersection of Rock Quarry Road and Bowman <br /> Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.