Orange County NC Website
Article 4: Overlay Zoning Districts 16 <br /> Section 4.2: Watershed Protection <br /> IMPERVIOUS • POND REQUIREMENTS <br /> DISTRICT IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS(RESIDENTIAL) <br /> FLAT-PW 12%impervious surface limit for new and existing lots. [11, [21 <br /> HYCO-PW *&MPs n n n n# h-e i ed- #n satmsf i wate ro h e d i pe ry 0 9 61 s s 1rfaGe r q 61 0 Fe n#c <br /> 12%impervious surface limit for existing and new lots outside of Transition Areas as <br /> designated in the Orange County Land Use Plan. [11, [21 <br /> 30%impervious surface limit for developments which exceed a density 1 du/acre within <br /> U-ENO-PW Transition Areas as designated in the Orange County Land Use Plan. Structural BMPs are <br /> BACK-PW required if impervious surface exceeds 12%. <br /> 70%impervious surface limit for residential uses developed at"high intensity"densities (R- <br /> 5, R-8, and R-13) in an Economic Development District as designated in the Land Use <br /> Element of the Comprehensive Plan (high-density option)with structural BMPs if ISR <br /> exceeds---12%. <br /> 24%impervious surface limit with curb and gutter. <br /> 36%impervious surface limit without curb and gutter. <br /> [11, [21 [1] BMPs n n#ho i ed-#e co#isfy watershed impervieus irfaGe r Rts <br /> 70%impervious surface limit for residential uses developed at"high intensity"densities (R- <br /> L-ENO-PW 5, R-8, and R-13) in an Economic Development District as designated in the Land Use <br /> Element of the Comprehensive Plan (high-density option),with structural BMPs required <br /> when impervious surface exceeds: <br /> 24%(w/curb and gutter);or <br /> 36% w/o curb and gutter). <br /> HAW-PW 24%impervious surface limit. [11, [21 <br /> JORDAN-PW L <br /> r1] BMPs P-annet be used to satisfy watershed impeMeus irfa Ge r n#c <br /> [1;;"Awed Allowable impervious surface area may be modified in accordance with Section 4.2.8 of the UDO.4 <br /> 121 Regardless of the proposed amount of impervious surface area, a stormwater feature/best management practice <br /> (BMP) may still be required based on the proposed amount of land disturbance on a given parcel of property in <br /> accordance with applicable Orange County Erosion Control and State Stormwater regulations. s <br /> Hillsborough Economic Development District <br /> (1) The ' h Economic Develo rict is located within the Lower Eno <br /> - Unprotected wa a the Hillsborough Economic Development <br /> District, as ed in the Lan ment of the Comprehensive Plan, the <br /> um impervious surface ratio is 50% with onds. <br /> 4 This references the Section of the UDO where are now recognizing a State provision allowing for the additional <br /> allotment of impervious surface area through the use of specific BMPs. <br /> 5 The County enforces land disturbance thresholds for erosion control and stormwater permits,specifically a <br /> certain amount of land disturbance will require the submittal of either an erosion control permit and/or a <br /> stormwater permit application. While a BMP may be installed on a parcel of property as part of a proposed <br /> modification of allowable impervious surface area,the County also enforces standards requiring a BMP on <br /> property being developed for residential purposes based on the proposed amount of land disturbance. This <br /> requirement has nothing to do with the total amount of impervious surface area proposed or any request to <br /> modify same. Land disturbance thresholds vary for each district. We are adding language to the UDO clarifying <br /> when a BMP is required based on these existing disturbance thresholds. <br /> Orange County, North Carolina—Unified Development Ordinance Page 4-7 <br />