Browse
Search
Agenda - 04-10-2006 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 04-10-2006
>
Agenda - 04-10-2006 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2015 8:20:32 AM
Creation date
6/15/2015 8:19:59 AM
Metadata
Fields
Template:
BOCC
Date
6/10/2006
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes - 20060410
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommendations of the Committee <br /> Note: In reviewing the master plan and the following recommendations, it may be useful <br /> to think of the master plan for the site as having three sections, or"pods."The "southern <br /> pod"includes the majority of proposed park facilities and would be accessed from Torain <br /> Street or the connector trail (see below) - or for persons outside of the neighborhood, <br /> from the NC 571 NC 86 intersection. The "western pod"is located adjacent to the existing <br /> community policing station and is adjacent to Rainey Avenue. The "eastern pod" <br /> contains the County Public Works site and future Town Public Works site, along with <br /> other planned future County facilities. The reason for the "pod" design approach is <br /> explained in the rationale section on page 6. <br /> After considering all of the above information and discussing the <br /> possibilities, the Committee recommends the following actions as <br /> facility improvements for Phase 2 of the park: <br /> 1. That the following facilities be constructed as Phase 2 of the <br /> Fairview Park as the top priorities (as shown on the attached <br /> Master Plan map on page 4). These facilities are listed in <br /> priority order, with the understanding that some facilities may <br /> need to be deferred based on available funds: <br /> • Two hard-surface lighted basketball courts, located the <br /> "southern pod. " <br /> • A full-size youth baseball/softball field, located in the <br /> southern part of the site. <br /> • Two new playgrounds, one near the new ballfield in the <br /> "southern pod, " and a replacement playground in the <br /> "western pod " near the existing structure and police <br /> station. <br /> • A picnic shelter with concessions bay (and possible <br /> restrooms), located near the new ballfield in the <br /> "southern pod" <br /> • Walking trails of approximately 1/2 milein total, with a <br /> main trail connection between the ballfield ("southern <br /> pod") and the police station / playground ("we stern <br /> pod"). There would also be a trail around the new <br /> ballfield, with spur to the southern parking lot and Torain <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.