Orange County NC Website
Committee Meetings and the Design Process <br /> In its four meetings, the Master Plan Committee has strived to be efficient and <br /> yet diligent in approaching the development of recommendations in a stepwise <br /> fashion. <br /> Prior to the committee's formation, a preliminary concept plan outlining the <br /> general locations of different uses was created to help guide the process. This, in <br /> conjunction with the Memorandum of Agreement, was used to create the design <br /> parameters. <br /> The following table summarizes the activities of the committee meetings. <br /> Date of • Activities <br /> October 4 Overview of projects and charge, review of <br /> Challenges and Opportunities report, preparation for <br /> design charrette <br /> November 1 Listing of facility preferences and identification of <br /> priority facilities. Conduct design charrette with base <br /> maps (split into two design groups). Site walk for <br /> committee members scheduled and held Dec 2-3 <br /> (Friday/Saturday) <br /> December 8 Review of draft master plans based on charrette, <br /> identification of the preferred design, updates on <br /> other Fairview matters <br /> January 19 Adoption of master plan and report, final thou hts <br /> The Fairview Master Plan Committee during the design charrette. <br /> 3 <br />