Browse
Search
Agenda - 06-03-2008-4aa
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-4aa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:04:51 PM
Creation date
8/28/2008 10:20:39 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
4aa
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br />emergency and service access. Maximum use of existing roads, whether <br />public or private, shall be made to the extent practicable. Road construction <br />shall, at all times, minimize ground disturbance and the cutting of <br />vegetation. Road grades shall closely follow natural contours to assure <br />minimal visual disturbance and reduce soil erosion. <br />The applicant shall demonstrate and provide a description in writing and by <br />drawing how it shall effectively screen from view the base and all related <br />equipment and structures of the proposed facility. <br />The facility and any and all accessory structures shall maximize the use of <br />building materials, colors and textures designed to blend with the structure <br />to which it may be affixed and to harmonize with the natural surroundings. <br />This shall include the utilization of stealth or camouflage or concealment <br />technology as the County may require. <br />All utilities at a facility site shall be installed underground and in compliance. <br />with all Laws, ordinances, rules and regulations of the County, including <br />specifically, but not limited to, the National Electrical Safety Code and the <br />National Electrical Code where appropriate. <br />m) A statement shall be submitted, prepared by a professional engineer <br />licensed in the State of North Carolina, which through rational engineering <br />analysis, certifies the tower's compliance with applicable standards as set <br />forth in the State of North Carolina Building Code, and any associated <br />regulations; and describes the tower's capacity, including an example of the <br />number and type of antennas it can accommodate. <br />n) All wireless support structures shall satisfy all applicable public safety, land <br />use, or zoning issues required in this Ordinance, including aesthetics, <br />landscaping, land-use based location priorities, structural design, setbacks, <br />and fall zones. <br />8.8.17a.2 Standards of Evaluation <br />The following specific standards shall be used in deciding upon an application for <br />approval: <br />b} Location of Wireless Support Structures. Applicants for facilities shall <br />locate, site and erect said facilities according to the following priorities, in <br />the following order: <br />1) On existing County-owned facilities without increasing the height of the <br />tower or structure. <br />2) On existing Facilities without increasing the height of the tower or <br />structure. <br />3) On County-owned properties or facilities. <br />4) On properties in areas zoned for commercial or industrial use. <br />5) On properties in areas zoned Agricultural Residential (AR). <br />6) On properties in areas zoned for residential use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.