Orange County NC Website
54 <br />Prior to issuing a building permit for the collocation of an antenna array on <br />an existing facility, an applicant shall demonstrate that the collocation is <br />located appropriately on the facility with the overall goal being to preserve <br />the carrying capacity of the facility for future collocations and to minimize <br />the visual intrusiveness and impact, including the profile of the facility. <br />In determining the necessary height for a facility, or the height of a collocation on a <br />facility, the signal strengths analyzed shall be the threshold or lowest signal <br />strength at which the customer equipment is designed to function, which may be <br />required to be determined by the manufacturer's published specifications for the <br />customer equipment. All telecommunications wireless support structures must <br />meet the following minimum standards: <br />e) Prior to the issuance of a Building/Electrical Permit by the <br />Inspections Division, a site development plan prepared in accordance with <br />Article XIV shall be presented for approval to the Planning Division. Each <br />application for a proposed telecommunications tower shall include all <br />requirements for site development plan approval as required. Approval of <br />the Planning Director or his/her designee to verify consistency with the <br />definition of stealth facility is required. Each application shall contain a <br />rendering or photograph of the tower including, but not limited to, colors <br />and screening devices. <br />b) All telecommunications towers shall be placed in heavily wooded areas on <br />the site to the maximum .extent possible so as to lessen the visual <br />intrusiveness of the structure and accessory structures. A statement shall <br />be submitted by the applicant stating how the proposed tower will minimize <br />visual intrusiveness to surrounding properties in the area. Criteria that may <br />be used for such evidence may be height and type of existing trees <br />surrounding the proposed tower, and local topography. <br />c) A statement ,shall be submitted, prepared by a professional engineer <br />licensed. in the State of North Carolina, which through rational engineering <br />analysis, certifies the tower's compliance with applicable standards as set <br />forth in the State of North Carolina Building Code, and any associated <br />regulations; and describes the tower's capacity, including an example of the <br />number and type of antennas it can accommodate. <br />d) Applicants shall provide at time of application submittal: <br />1) The existing cell sites (latitude, longitude, power levels) to which this <br />proposed site will be a handoff candidate; <br />2) Propagation studies of the proposed site and showing all adjoining <br />planned, proposed, in-service or existing sites; <br />3) The search ring utilized in finding the proposed site; <br />4) The make, model and manufacturer of the tower and antenna(s), <br />antenna heights and power levels of proposed site; <br />5) The frequency, modulation and class of service of radio or other <br />transmitting equipment; <br />