Browse
Search
Agenda - 06-03-2008-4aa
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-4aa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:04:51 PM
Creation date
8/28/2008 10:20:39 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
4aa
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />County or State regulations for the construction of roads. If the <br />current access road or turn around space is deemed in disrepair or <br />in need of remedial work to make it serviceable and safe and in <br />compliance with any applicable regulations as determined at a site <br />visit, then the Application shall contain a commitment by the <br />applicant to remedy or restore the road or turn around space so that <br />it is serviceable and safe and in compliance with applicable <br />regulations. <br />approved wireless support structure shall also provide the following: <br />A detailed narrative description and explanation of the specific <br />objective( for the new facility; expressly including and explaining <br />the purpose for the .facility, such as coverage and/or capacity, <br />technical requirements, and the identified boundaries of the specific <br />geographic area of intended coverage; <br />2) Technical documentation demonstrating that the facility is designed <br />to provide the service type and service coverage needed primarily <br />within the County. Such documentation shall include a propagation <br />study of the proposed site and all adjoining planned, proposed or <br />existing sites, that demonstrates a significant gap in coverage <br />and/or, if a capacity issue is involved, to include an analysis of the <br />current and projected usage (traffic studies) using generally <br />accepted industry methods and standards so as to conclusively <br />prove the need for what is proposed. <br />All of the modeling information used to produce the propa ag tion <br />studies, includir~, but not limited to any assumptions made about <br />ambient tree height; <br />A copy of the FCC license applicable for the intended use of the <br />facility, as well as a copy of the five (5) and ten (10) year build-out <br />plan required by the FCC; <br />5) The frequency, modulation and class of service of radio or other <br />transmitting equipment; <br />61 The maximum transmission power caoability of all radios. as <br />or the maximum transmission power capability, as designed, of all <br />transmission facilities if the applicant is not a cellular or functional <br />equivalent carrier; <br />The actual intended transmission power stated as the maximum <br />effective radiated power (ERP), both in dBm's and watts; <br />8) A statement certifying that the facility and all attachments thereto <br />comply with the conditions of the approved Special Use Permit. <br />9~ The legal name, address, phone number, all necessary contact <br />information of the person preparing the application; <br />
The URL can be used to link to this page
Your browser does not support the video tag.