Browse
Search
Minutes 04-14-2015 - Work Session - Late
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2015
>
Minutes 04-14-2015 - Work Session - Late
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 8:37:36 AM
Creation date
6/3/2015 10:12:07 AM
Metadata
Fields
Template:
BOCC
Date
4/14/2015
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 04-14-2015 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-14-2015 - Work Session - Late
Agenda - 04-14-2015 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-14-2015 - Work Session - Late
Agenda - 04-14-2015 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-14-2015 - Work Session - Late
Agenda - 04-14-2015 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-14-2015 - Work Session - Late
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Georgeville Series <br /> Wynott Series <br /> Golston Series <br /> Aerobic zone <br /> Pump System Components <br /> If the drain field is higher than the house, a pump system must be used. <br /> Advanced Treatment System Components- <br /> Waste is treated to almost a drinking water standard and works for non-conventional soils. <br /> Septic Trench Options <br /> • Conventional Trench <br /> • Accepted Trench Products <br /> • Chamber Trench <br /> • Polystyrene Trench <br /> • Tire Chips <br /> • Panel Block <br /> • Low Pressure Pipe <br /> • Drip <br /> Commissioner Pelissier asked if any of these alternatives exist in Orange County. <br /> Alan Clapp said yes. He said Orange County has an aerobic treatment unit as well as <br /> some pete filters. <br /> Conventional Trench (photo) <br /> Aerobic zone <br /> Chamber Trench (photo) <br /> • 25% Drain field reduction <br /> Trench is same as conventional but no rock (photo) <br /> • Polystyrene Trench <br /> • 25 % Drain field reduction <br /> Polystyrene Systems (photo) <br /> • 25 % Drain field reduction <br /> • Accepted Trench Product as equivalent to Conventional <br /> Panel Block System <br /> • Allows 50% reduction <br /> • Requires 36" of usable soil. <br /> LPP Trench (photo) <br />
The URL can be used to link to this page
Your browser does not support the video tag.