Browse
Search
RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2015
>
RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 10:14:32 AM
Creation date
6/3/2015 10:03:02 AM
Metadata
Fields
Template:
BOCC
Date
6/2/2015
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
6i
Document Relationships
Agenda - 06-02-2015 - 6i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 06-02-2015 - Regular Mtg.
Minutes 06-02-2015
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RES-2015-032 <br /> Resolution Endorsing Transportation Projects for Submission for State Scoring <br /> 2) 1-40 Widening from 1-40/1-85 interchange to U.S. 15-501: Widen 1-40 from four (4) lanes to six <br /> (6) lanes from the 1-40/1-85 interchange to U.S. 15-501/Durham County line. <br /> 3) 1-40 Widening from Old NC 86 to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes <br /> from Old NC 86 to U.S. 15-501/Durham County line. <br /> 4) 1-40 Widening from NC 86 to U.S. 15-501: Widen 1-40 from four (4) lanes to six (6) lanes from <br /> NC 86 to U.S. 15-501/Durham County line. <br /> 5) 1-85/Old NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and Old NC 86. <br /> 6) 1-85/NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and NC 86. <br /> 7) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC <br /> 57 to four(4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. <br /> 8) Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno <br /> Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) <br /> and make safety improvements. <br /> 9) U.S. 70 East/1-85/1-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at <br /> U.S. 70 to provide access from all directions. <br /> 10)Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old <br /> NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor <br /> where they do not exist. <br /> 11)Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC <br /> 86 (SR 1009) to NC 86. <br /> 12)Mt. Carmel Church Road Bike/Pedestrian Improvements: Construct bike lanes and sidewalks <br /> from US 15-501 to Bennett Road and bike lanes from Bennett Road to the Chatham County <br /> line. <br /> 13)Orange High School Road/Harold Latta Road Sidewalk Improvements: Construct a sidewalk <br /> along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct <br /> a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove <br /> Road, install high visibility crosswalks and in-road signage at school entrances and exits on <br /> Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle <br /> School. <br /> 14)Orange Grove Road/1-40 Pedestrian Bridge: Construct a pedestrian bridge over 1-40 alongside <br /> Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove <br /> Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both <br /> sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk <br /> along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. <br /> 15) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union <br /> Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot <br /> paved shoulders. <br /> 16)Trail Connection from English Hill Lane to Buttonwood Drive: Construct a multi-use path <br /> connecting English Hill Lane to Buttonwood Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.