Browse
Search
Agenda - 06-02-2015 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 06-02-2015 - Regular Mtg.
>
Agenda - 06-02-2015 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 8:12:45 AM
Creation date
5/29/2015 4:19:10 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 06-02-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* 13 <br />(which also will be accompanied by reconstruction of the existing stormwater management ponds in <br />that same area). Accordingly, construction of this new point of access into the site would need to be <br />included in Phase 1 of implementation, so that access to the site remains in place while the existing road <br />entrance to the site is reconfigured in Phase 2. <br />E. REPAIR OF STORMWATER MANAGEMENT FACILITIES <br />There are two stormwater detention ponds currently existing near the site's entrance on Homestead <br />Road. Both are in poor condition and in need of repair /reconstruction /replacement. The Master Plan <br />identifies and acknowledges this need (as does the approved Special Use Permit), and proposes to <br />replace the existing ponds with two new ponds, one on each side of the newly realigned entrance road. <br />In addition to satisfying stormwater management requirements, these ponds will also be strategically <br />located in a manner that will provide a significant site amenity along this main entry drive. <br />As noted above, the phasing of site elements can work well and efficiently by (1) Constructing the new <br />access road as part of Phase 1 of implementation, and (2) Including the realignment of the entrance <br />road, the reconstruction of the stormwater ponds, and the major expansion of the Seymour Center, all <br />of which are in close proximity to each other, together in Phase 2. This is described below in the phasing <br />discussion. <br />F. SUBDIVISION OF SITE INTO THREE PARCELS <br />A final key consideration is a recommendation that the 34 acre site be subdivided into three parcels, <br />each slightly larger than 10 acres in size, to allow flexibility for the County in securing potential financing <br />for separate phases of this implementation. The proposed configuration of the subdivision appears <br />below. <br />11 <br />Ili �, �, ... �_ •- � � <br />Southern Orange County Government Services Campus I Implementation Report Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.