Browse
Search
Agenda - 06-02-2015 - 6i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 06-02-2015 - Regular Mtg.
>
Agenda - 06-02-2015 - 6i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 8:09:13 AM
Creation date
5/29/2015 4:10:51 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6i
Document Relationships
Minutes 06-02-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
RES-2015-032 Resolution Endorsing Transportation Projects for Submission for State Scoring
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RES- 2015 -032 6 <br />Attachment 1: Draft Resolution Endorsing Transportation Projects for Submission for State <br />Scoring <br />2) 1 -40 Widening from 1- 40/1 -85 interchange to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six <br />(6) lanes from the 1- 40/1 -85 interchange to U.S. 15- 501 /Durham County line. <br />3) 1 -40 Widening from Old NC 86 to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six (6) lanes <br />from Old NC 86 to U.S. 15- 501 /Durham County line. <br />4) 1 -40 Widening from NC 86 to U.S. 15 -501: Widen 1 -40 from four (4) lanes to six (6) lanes from <br />NC 86 to U.S. 15- 501 /Durham County line. <br />5) 1- 85/Old NC 86 Interchange Improvements: Reconstruct interchange at 1 -85 and Old NC 86. <br />6) 1 -85 /NC 86 Interchange Improvements: Reconstruct interchange at 1 -85 and NC 86. <br />7) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC <br />57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. <br />8) Eno Mountain Road /Mayo Street at Orange Grove Road: Realign the intersection of Eno <br />Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) <br />and make safety improvements. <br />9) U.S. 70 East/1- 85/1 -40 Connector: Modify the 1- 85/1 -40 Connector (SR 1239) interchange at <br />U.S. 70 to provide access from all directions. <br />10) Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old <br />NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor <br />where they do not exist. <br />11) Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC <br />86 (SR 1009) to NC 86. <br />12) Mt. Carmel Church Road Bike /Pedestrian Improvements: Construct bike lanes and sidewalks <br />from US 15 -501 to Bennett Road and bike lanes from Bennett Road to the Chatham County <br />line. <br />13) Orange High School Road /Harold Latta Road Sidewalk Improvements: Construct a sidewalk <br />along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct <br />a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove <br />Road, install high visibility crosswalks and in -road signage at school entrances and exits on <br />Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle <br />School. <br />14) Orange Grove Road /1 -40 Pedestrian Bridge: Construct a pedestrian bridge over 1 -40 alongside <br />Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove <br />Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both <br />sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk <br />along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. <br />15) Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union <br />Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4) -foot <br />paved shoulders. <br />16) Trail Connection from English Hill Lane to Buttonwood Drive: Construct a multi -use path <br />connecting English Hill Lane to Buttonwood Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.