Orange County NC Website
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project List <br />Map ID #` <br />Project <br />Project Description/Need <br />SPOT 3.0 Score <br />corridor where congestion is the most profound, and consequently, the project has a greater chance of being funded and included in the <br />STIP in earlier years than in the existing draft 2016 -2025 STIP. <br />Description and Need: Reconstruct interchange at 1 -85 and Old NC 86 to relieve existing and /or future expected congestion on the under - <br />5 <br />1 -85/Old NC 86 Interchange Improvements <br />capacity existing interchange, to accommodate future capacity improvements to both Churton Street and I -85, and to increase operational <br />N/A (New Project) <br />efficiency at the on -ramp /off -ramp intersections with Churton Street. The new interchange would also be an opportunity to provide <br />pedestrian and biking facilities across 1 -85 that do not currently exist along the corridor. <br />Description and Need: Reconstruct interchange at 1 -85 and NC 86 to relieve existing and /orfuture expected congestion on the under - <br />6 <br />1-85/NC 86 Interchange Improvements <br />capacity existing interchange, to accommodate future capacity improvements to 1 -85, and to increase operational efficiency at the on- <br />N/A (New Project) <br />ramp /off -ramp intersections with NC 86. The new interchange would also be an opportunity to provide pedestrian and biking facilities <br />across 1 -85 that do not currently exist along the corridor. <br />Description: Widen NC 86 from U.S. 70 bypass to north of NC 57 to four (4) lanes with intersection improvements at U.S. 70 bypass and <br />NC 57. Improvements at the NC 86 /U.S. 70 intersection should include extending the queuing lane fortraffic turning east onto U.S. 70 <br />bypass from northbound Churton Street /NC 86. Improvements at the NC 86 /NC 57 intersection should include a crosswalk and provide a <br />safe crossing for pedestrians with a sidewalk connecting the intersection of NC 86 and NC 57 to Rencher Street. This project is not <br />24.16 Regional <br />7 <br />NC 86 Improvements north of Hillsborough <br />currently listed or recommended in the DCHC MPO MTP but is recommended in the DCHC MPO CTP. <br />19.46 Division <br />Need: The segment of NC 86 between NC 57 and U.S. 70 is highly congested. Traffic counts indicate that this segment of NC 86 is over <br />capacity for average annual daily counts. Capacity improvements would ease congestion and improve travel time along this primary north - <br />south corridor connecting the Town of Hillsborough to NC 57 and northern Orange county. <br />Description: Realign the intersection of Eno Mountain Road and Mayo Street with Orange Grove Road and make safety improvements. <br />Eno Mountain Road and Mayo Street at <br />This project is not provided /recommended in the DCHC MPO MTP but is recommended in the DCHC MPO CTP. <br />8 <br />Orange Grove Road intersection realignment <br />5.10 Division <br />and safety improvements <br />Need: The project would improve safety, reduce travel time, and improve traffic flow between residential and commercial areas in the <br />Town of Hillsborough. <br />Description: Modify the 1 -85 Connector interchange at U.S. 70 to provide access from all directions. The existing Connectorjust east of <br />Efland is not accessible to traffic on eastbound U.S. 70 and there is no access to westbound U.S. 70 from the Connector. This project is <br />recommended in the DCHC MPO MTP. <br />9 <br />U.S. 70 East /I -85 Connector <br />Need: The project would enable traffic from northwestern Orange County to access 1 -85 more easily without risking the many points of <br />7.34 Regional <br />traffic conflict through Efland. Traffic has increased on Efland-Cedar Grove Road as an alternative to NC 86. Much of that traffic currently <br />4.90 Division <br />"dog -legs" through Efland via Forrest Avenue to Mt. Willing Road to access 1- 85/1 -40. Traffic counts reveal that traffic has increased <br />approximately 40q overthe past 10 years on Mt. Willing Road just south of Forrest Avenue, while traffic on U.S. 70 east of Efland -Cedar <br />Grove Road has increased only 2%. The project would dramatically improve travel time fortraffic from northwestern Orange County to 1- <br />85/1-40 and would dramatically ease congestion during peak periods in Efland. <br />Description: Improve Homestead Road from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the <br />corridorwhere those facilities do not exist. This project is provided /recommended in the DCHC MPO MTP. <br />10 <br />Homestead Road bike lane and sidewalk <br />Need: There are three (3) schools in the vicinity of Homestead Road: Chapel Hill High School, Smith Middle School, and Seawell <br />10.37 Division <br />installation <br />Elementary School. Many students live within walking and biking distance of Chapel Hill High School and must walk or cycle along or <br />across Homestead Road on a daily basis. Provision of bikeway and pedestrian facilities is necessary to give students a comfortable and <br />safe place to travel separate from that of motorized vehicular traffic. Homestead Road is also a commuting route for adult utilitarian <br />bicyclists connecting residential areas to other arteries serving employment centers. <br />Description: Construct bicycle lanes on Eubanks Road from Old NC 86 (SR 1009) to NC 86. This project is provided /recommended in the <br />DCHC MPO MTP. <br />11 <br />Eubanks Road bike lane installation <br />11.75 Division <br />Need: This project would provide a separate facility for both recreational and commuter bicyclists to reduce /eliminate the bike/automobile <br />modal conflict along this corridor. The project would also provide access to the Morris Grove Elementary School on Eubanks Road. <br />