Orange County NC Website
Attachment 4: Draft Triangle Area Rural Planning Organization ( TARPO) Project List <br />Rank/ Map ID #* <br />Project <br />Project Description /Need <br />SPOT 3.0 Score <br />The vehicles eligible for use <br />Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south of the schools and <br />Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service expansion as recommended in the Orange County Bus and Rail Investment Plan <br />within the TARPO planning <br />area have been ordered and <br />Orange County Bus and <br />connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve safety for motorized vehiculartravel <br />will be delivered to the <br />Rail Investment Plan <br />on this segment of Orange Grove Road. The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context <br />Park - and -ride or kissand- <br />and is only eligible for funding in the division tier. <br />-neap iu Number corresponds to the general iocanon of eacn project on Attachment a: 1AKPO Pro /ea List neap. <br />** Bike projects require a 20q local match and must be locally administered. Right- of-way acquisition is also not a permissible cost to be funded by NCDOT forthese projects. <br />* ** Project is in the existing STI P, the project is being resubmitted in its STI P form. <br />Proiects Deleted From Draft Prioritv List <br />Project <br />Project Description <br />Reason For Deletion <br />Orange Public <br />The vehicles eligible for use <br />Transportation Expansion <br />Vehicles to Implement the <br />Up to six (6), 25 -foot, 18- passenger cutaway bus vehicles to accommodate bus service expansion as recommended in the Orange County Bus and Rail Investment Plan <br />within the TARPO planning <br />area have been ordered and <br />Orange County Bus and <br />(OCBRIP) and the Five -Year Orange County Bus Service Expansion Program. <br />will be delivered to the <br />Rail Investment Plan <br />County in August 2015. <br />Park - and -ride or kissand- <br />ride improvements at the <br />Park -and -Ride <br />Cedar Grove Community <br />Improvements at Cedar <br />Implement park - and -ride improvements at the Cedar Grove Community Center for potential fixed -route service to Hillsborough. <br />Center were incorporated <br />Grove Community Center <br />into the construction plans <br />(Conceptual) <br />for the Cedar Grove <br />Community Center <br />rehabilitation. <br />