Browse
Search
2015-218 Interlocal Agreement - OWASA Relating to Design of a Sewer Main Extension Project in the Rogers Road Area
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-218 Interlocal Agreement - OWASA Relating to Design of a Sewer Main Extension Project in the Rogers Road Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2016 3:33:27 PM
Creation date
5/21/2015 11:05:11 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2015
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
61
Document Relationships
Agenda - 05-19-2015 - 6i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-19-2015 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. The Project shall be designed as a gravity-flow system, to the extent <br /> practical, and shall be designed to provide access to every Property identified by PIN on Exhibit <br /> A to connect and be served. <br /> e. The County shall be responsible for payment and satisfaction of all <br /> obligations arising out of the performance and completion of the Contract, due from it as Owner <br /> of the Project, and shall indemnify and hold OWASA harmless from claims that may arise out of <br /> the Contractor's performance, or out of the County's performance of its duties as Owner of the <br /> Project, or that may be made against OWASA, except for such sums as may become due upon <br /> the adjudication of gross negligence or willful misconduct on the part of OWASA's employees. <br /> f. In order to ensure proper and effective Project management, OWASA <br /> shall select and shall have charge of supervision of the engineering and other consultants who <br /> shall oversee the design of the Project. Those professional engineers and consultants shall be <br /> subject to the oversight and direction of OWASA's Engineer who shall have charge of <br /> OWASA's responsibilities hereunder. The Engineer and other consultants selected by OWASA <br /> shall report to OWASA staff, who shall work closely with County staff to ensure the County's <br /> requirements for the Project are met. In the event of any apparent conflicts between the <br /> County's and OWASA's requirements, the parties shall work together to find reasonable <br /> compromise and accommodations for the Project. In close coordination with OWASA and <br /> consistent with the need for effective Project management, the County Engineer or his/her <br /> designated representative will have full access to the Engineers and consultants working on the <br /> Project who shall upon request meet with the County representatives or provide any information <br /> needed by the County on any aspect of the Project. OWASA will authorize the Engineers and <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.