Orange County NC Website
r r <br />U. S. DePARIlbNT OF BonSINC AND UkIAN DEVELoPMEM <br />SLC ?ION a BOUSING ASSISTANCE PAIMENtS PROGRAM <br />Moderate 1lahabilitation <br />PART I OF THE <br />ANNUAL CONTRLSUTIONS C0lnILACT <br />Master Section 8 ACC Humber A --2903 <br />ACC Part I Number 1-1. 903-K <br />P_ <br />1.1 The Progrst <br />(a) Pro ects within Pro rat. The Moderate Rehabilitation Program +order this <br />ACC Part I includes all Projects listed in Exhibit I. The 1'h, to the <br />maximum extent feasible, shall amter into Agreements and Contracts in <br />accordance with the ambers and sizes of units in each project specified <br />In Exhibit 1. No substantial deviation as defined by HUD from the bedroom <br />distribution or number of units in each project is allowed wittiout prior <br />BUD approval. The PKA shall not enter into any Agreements or Contracts or <br />take any other action which will result in a claim for an Annual <br />Contribution in respect to any Project in excess of the max1pum amount <br />authorized for that Project. <br />(b) Meaning of ?ro ject` as Used in Master ACC and Part 11. For purposes of <br />this Part I the term "Project- wherever used in the Master Section 8 ACC <br />and in Part 11 shall mein each Project in the Moderate lehabilitation <br />Program. <br />1.2 Authorization of Actions by PHA. In order to carry out the Project, the PEA is <br />authorized to (a) enter into Agreements, (b) enter into Contracts, (c) sake <br />housing assistance payments on behalf of Families and (d) take all other <br />necessary actions, all in accordance with the application, forms, conditions <br />and requirements prescribed or approved by BUD. Bowever, neither t1se PHA nor <br />BUD shall assume any obligations beyond those provided in the prescribed forts <br />of Agreement and Contract. <br />1.3 Term of Contract and ACC <br />(a) Term of Contract. The total Contract term for any unit, including new <br />Contracts for replacesent units in accordance with Section 1.9, is i5 <br />years or the remaining term of the ACC, whichever is let ;. If the <br />rehabilitation being done under any Contract is to be completed im stages, <br />the total Contract teas for all the stages, beginning with thv effective <br />date of the Contract with respect to the first stage, shall not exceed 17 <br />years from the effective date of the ACC for the applicable Project. <br />(b) Term of ACC. - The ACC shall remain in effect for 17 yea- from the <br />effective date of the most recent project listed in Exhibit T.. Annual <br />Contributions may be made for eacb project for a maximum of 17 -ears fro= <br />that projects effective date. but not sore than 13 years for any unit. <br />Accordingly. the Contracts) for all units in any project,, ether than <br />replacement vults, must be executed within two years of the elfe :tive date <br />of that Project under the ACC to qualify for the 15 year term. <br />Page 1 of 5 <br />