Orange County NC Website
FOOTNOTE 3: Natural or landscaped buffer standards (exceptions allowed for water bodies <br />located in the buffer and specifically designed as a landscape feature): <br />1. Where surface parking and/or a service area is in the yard space adjacent to the <br />right -of -way, a continuous screen of evergreen plant material and/or berm that <br />reaches at least 10-12 feet high within 3 years is required. <br />Buffer <br />Right of Way 1 50, <br />2. Where the building(s) only is in the yard space adjacent to the right-of-way, <br />intermittent screening of mixed deciduous and/or evergreen plant material <br />and /or berm aat least 10-12 feet high within 3 years is required. <br />Buffer <br />Right of Way I so, <br />FOOTNOTE 4: Building setback description <br />Building Setback <br />Right of Way <br />- - - - 8 1 -W - W <br />Idt <br />