Orange County NC Website
and circulation growth -Proposed CIP Project, years 6 to <br /> 10 <br /> Lucinda Munger said the Southern Library Project is ongoing. She said the library will <br /> be installing a library kiosk, holding about five hundred items, to coincide with the opening of <br /> the Cedar Grove Community Center. She said this kiosk will be serviced by the current currier <br /> service. She said the main library branch is in the CIP for years six through ten for the <br /> following reasons: <br /> 1. Projected population increase of 2,300 new residents within the town limits of <br /> Hillsborough. <br /> 2. A train station to be built on the Collins property, within walking distance of <br /> downtown Hillsborough. <br /> 3. The possibility of another residential area in the downtown area of Hillsborough. <br /> 4. The library currently has a lot of constrained space. <br /> Commissioner Price asked if there would be an addition to the library or a <br /> reconfiguration of the current space. <br /> Lucinda Munger said the best use of their current space is being discussed. She said if <br /> current space is not sufficient, then the option of building up or out will be considered. <br /> Commissioner Jacobs asked if there have been any discussions with Hillsborough <br /> about co-locating a library in the Colonial Inn. <br /> Lucinda Munger said no. <br /> Jeff Thompson said the library kiosk item is listed on page 24. <br /> Jeff Thompson presented the following PowerPoint slide: <br /> Justice Facilities Subqroup <br /> Constraints Opportunities <br /> -Inadequate, depreciated detention facility -New detention facility <br /> -Proposed CIP Project <br /> Complete Fiscal Year 2018 to 2019 <br /> -Chapel Hill Court facility -Potential site at Southern <br /> Campus <br /> Jeff Thompson said the jail is inadequate, and a new detention facility will be soon be <br /> built. He said the Chapel Hill Courts Facility may relocate to the Southern Campus but there is <br /> no time frame for this move. He said the new Justice Facility in Hillsborough is adequate, well <br /> used and well operated space. <br /> Sheriff Blackwood said the justice facilities in Chapel Hill can be absorbed into <br /> Hillsborough, but it would not be convenient for residents, operational staff, attorneys, and <br /> police officers. He said the thought of moving it too far north is one that he would hope to <br /> steer away from. <br /> Sheriff Blackwood said the Old Courthouse within the new justice facility, the Mural <br /> Courtroom, was built as a sixty-year courthouse. He said it has served, and continues to <br /> serve, its purpose very well. He said they do have room for expansion at the new facility in <br /> Hillsborough, but not in Chapel Hill. Sheriff Blackwood said it is important to think ahead since <br /> construction costs are only going to go up. <br /> Commissioner Pelissier said the space study did not look at the old jail. She said how <br /> would the old jail be used when the new jail is built. <br />