Browse
Search
Minutes 04-09-2015
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2015
>
Minutes 04-09-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 2:59:00 PM
Creation date
5/20/2015 8:06:01 AM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Budget Sessions
Document Type
Minutes
Document Relationships
Agenda - 04-09-2015 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-09-2015 - Budget Work Session
Agenda - 04-09-2015 - 1 & 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-09-2015 - Budget Work Session
Agenda - 04-09-2015 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-09-2015 - Budget Work Session
Agenda - 04-09-2015 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 04-09-2015 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and circulation growth -Proposed CIP Project, years 6 to <br /> 10 <br /> Lucinda Munger said the Southern Library Project is ongoing. She said the library will <br /> be installing a library kiosk, holding about five hundred items, to coincide with the opening of <br /> the Cedar Grove Community Center. She said this kiosk will be serviced by the current currier <br /> service. She said the main library branch is in the CIP for years six through ten for the <br /> following reasons: <br /> 1. Projected population increase of 2,300 new residents within the town limits of <br /> Hillsborough. <br /> 2. A train station to be built on the Collins property, within walking distance of <br /> downtown Hillsborough. <br /> 3. The possibility of another residential area in the downtown area of Hillsborough. <br /> 4. The library currently has a lot of constrained space. <br /> Commissioner Price asked if there would be an addition to the library or a <br /> reconfiguration of the current space. <br /> Lucinda Munger said the best use of their current space is being discussed. She said if <br /> current space is not sufficient, then the option of building up or out will be considered. <br /> Commissioner Jacobs asked if there have been any discussions with Hillsborough <br /> about co-locating a library in the Colonial Inn. <br /> Lucinda Munger said no. <br /> Jeff Thompson said the library kiosk item is listed on page 24. <br /> Jeff Thompson presented the following PowerPoint slide: <br /> Justice Facilities Subqroup <br /> Constraints Opportunities <br /> -Inadequate, depreciated detention facility -New detention facility <br /> -Proposed CIP Project <br /> Complete Fiscal Year 2018 to 2019 <br /> -Chapel Hill Court facility -Potential site at Southern <br /> Campus <br /> Jeff Thompson said the jail is inadequate, and a new detention facility will be soon be <br /> built. He said the Chapel Hill Courts Facility may relocate to the Southern Campus but there is <br /> no time frame for this move. He said the new Justice Facility in Hillsborough is adequate, well <br /> used and well operated space. <br /> Sheriff Blackwood said the justice facilities in Chapel Hill can be absorbed into <br /> Hillsborough, but it would not be convenient for residents, operational staff, attorneys, and <br /> police officers. He said the thought of moving it too far north is one that he would hope to <br /> steer away from. <br /> Sheriff Blackwood said the Old Courthouse within the new justice facility, the Mural <br /> Courtroom, was built as a sixty-year courthouse. He said it has served, and continues to <br /> serve, its purpose very well. He said they do have room for expansion at the new facility in <br /> Hillsborough, but not in Chapel Hill. Sheriff Blackwood said it is important to think ahead since <br /> construction costs are only going to go up. <br /> Commissioner Pelissier said the space study did not look at the old jail. She said how <br /> would the old jail be used when the new jail is built. <br />
The URL can be used to link to this page
Your browser does not support the video tag.