Orange County NC Website
Jeff Thompson said the current users of the buildings could be relocated elsewhere, <br /> and the buildings, or the land, could be used for other purposes. <br /> Chair McKee asked if the redevelopment would be done in two stages. <br /> Jeff Thompson said it would be a phased process. <br /> Chair McKee said there is also locked storage in this building. <br /> Jeff Thompson said the ADA Life Safety project has been inserted in this phase. He <br /> said most of this will be completed in the next two months. <br /> Jeff Thompson continued the PowerPoint presentation: <br /> Emerqency Services Subqroup <br /> Constraint Opportunities <br /> -In need of back-up Communications Center -CIP addresses back-up in lower level <br /> of West Campus Office Building <br /> -510 Meadowlands not a "hardened" -Merit in potentially repurposing <br /> facility West Campus Office Building lower <br /> level for primary ES facility <br /> -Field sub-station need -Proposed CIP Project <br /> Jeff Thompson said this is related to the need for a back-up Emergency Services 911 <br /> Communications Center. He said the lower level of the West Campus Office Building is being <br /> proposed as the location for this project. He said this location is designed for such a center as <br /> this. He said this is also being discussed as a permanent center. He said there are current <br /> meeting rooms that are located there, but these rooms could be moved elsewhere, such as the <br /> lower level of the Link Center. <br /> Jim Groves, of Emergency Services, said if the co-locations work out, they would be <br /> building on the north side with the Hillsborough Fire Department and the Town of Hillsborough, <br /> and the Revere Road Station would be able to move there. He said the other field sub- <br /> stations are in the CIP for the second year with plans to do something in the Waterstone area. <br /> Paul Laughton said the information about the back-up Emergency Services Center is <br /> on page 44. He said the State of North Carolina is requiring a plan be in place by July 1St <br /> 2015, and the expenses would be covered by E-911 funds. He said the sub-stations <br /> information were are on page 42. <br /> Commissioner Pelissier asked about the timeline for determining whether the proposed <br /> back up at West Campus would remain a backup or a permanent site. <br /> Jim Groves said it is a priority now to have a 911 center backup. He said if the West <br /> Campus location is used for a more permanent site, the backup location could be easily <br /> transitioned to another site when available. <br /> Lucinda Munger, Library Director, presented the following slide: <br /> Library Subqroup <br /> Constraints Opportunities <br /> -Inadequate branch library space in -Southern Branch Library Site <br /> McDougle, Cybrary facilities; not owned Selection process ongoing <br /> -Proposed CIP Project <br /> -Potential constraint for main branch -Potential interior renovation of Main <br /> in out years because of population Branch, or other solution <br />