Orange County NC Website
Pam Jones, Interim Deputy Superintendent for OCS, said there are schools that will <br /> need major renovations. The OCS Board of Education is prioritizing the projects. She said the <br /> Board of Education knows, by school, what is needed to be done. <br /> Paul Laughton said listing the projects by categories had been a request of the County. <br /> He said the goal has been for continuity in looking between both the CHCCS and OCS plans. <br /> Paul Laughton said nothing in the CIP addressed the Facility Assessment Studies from <br /> the school systems, since the County had not yet received this information. <br /> Pam Jones said the OCS Board of Education appropriated an additional $150,000 last <br /> year out of their fund balance. She said these monies went specifically against some of the <br /> deferred maintenance items that are included in the assessment. She said this is done <br /> proactively due to the enormity of the needs and knowing that any future bond will not be able <br /> to address all of them. <br /> Chair McKee said he had heard funding estimates from CHCCS for some time but has <br /> not heard the same from OCS. He asked if the numbers previously mentioned by Paul <br /> Laughton were in line with what OCS felt they would need. <br /> Pam Jones said their focus has been on the Cedar Ridge additions. She said this is <br /> their biggest need. <br /> Chair McKee asked specifically about the $478,000 mentioned by Paul Laughton. <br /> Pam Jones said to get the additional capacity at Cedar Ridge High School will be a $12 <br /> million project, with $1.2 million needed for planning. She said the $478,000 will not be <br /> sufficient, but it could help with some preliminary work. She said the planning process will take <br /> some work, with likely zoning issues, and the $478,000 would help to move that along so they <br /> would be closer to being shovel ready. She said when the Board of Education concludes the <br /> process of prioritizing needs, there may be some smaller projects not previously anticipated to <br /> which the $478,000 may be applied. <br /> Commissioner Price asked about the process for the Phoenix Academy and the Bridge <br /> Program. <br /> Paul Laughton said this is on page 100. <br /> Bill Mullen, Director for Facilities for CHCCS, said the Phoenix Academy and the Bridge <br /> study would hopefully be part of the $750,000 Lincoln Center Analysis. <br /> Commissioner Price asked when the merger was expected. <br /> Bill Mullen said he did not know. <br /> 2. Space Study Work Group Report Presentation — with Discussion ofAssociated <br /> County Capital Proiects <br /> Jeff Thompson of Asset Management Services introduced this item and presented the <br /> following PowerPoint slides: <br /> Oranqe County Space Study Findinq and Recommendations <br /> Backqround of Space Study <br /> Alan Dorman, Asset Management Services, presented the following PowerPoint slides: <br /> Bedcheck <br /> • Facility walkthroughs <br /> • Spaces categorized <br />