Browse
Search
Agenda - 05-26-2015 - C-4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 8:58:51 AM
Creation date
5/18/2015 4:10:36 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-4
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4: Overlay Zoning Districts 32 <br />Section 4.2: Watershed Protection <br />6 Unlike residential development, State regulations require a stormwater feature for all non - residential projects <br />exceeding established impervious surface thresholds for the watershed protection overlay district in which the <br />Orange County, North Carolina — Unified Development Ordinance Page 4 -9 <br />IMPERVIOUS TABLE 4.2.6: • POND REQUIREMENTS <br />DISTRICT <br />IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br />2 -acre minimum lot size AND <br />U- ENO -CA <br />6% impervious surface limit. [11, [21 <br />5 -acre minimum lot size with potential of up to five lots as small as two acres for lots of record September 1, 2015 <br />(University Lake) or October 19, 1999 (Cane Creek) ( rneRded 10 19 99); AND <br />50% ISR for all fire stations and solid waste collection centers; AND <br />UNIV -PW <br />12% ISR for all other non - residential uses, AND <br />on -site infiltration of the first inch of stormwater runoff; AND <br />CANE -PW <br />a limit of 1.0% of the watershed for non - residential use (139 acres in CANE -PW). <br />[11 [2[ WARS n r.+ ho i od +r. satisfy watershed i iirFono r n +c FRe L JiLL <br />2 -acre minimum lot size AND <br />50% ISR for all fire stations and solid waste collection centers; AND <br />12% ISR for all other non - residential uses, AND <br />LITTLE -PW <br />on -site infiltration of the first inch of stormwater runoff; AND <br />a limit of 1.0% of the watershed for non - residential use (406 acres in LITTLE -PW). <br />f11 i [21 WARS A n+ he i ed +n satisfy watershed i 614ar.o r n +c <br />L JL� <br />70% <br />ISR in Economic Development, Commercial and /or Commercial- Industrial Nodes as designated in the Land Use <br />Element of the Comprehensive Plan (high- density option) with structural BMPs if ISR;:—exceeds 12 %; AND <br />50% ISR for all fire stations and solid waste collection centers outside of Commercial and /or Commercial - <br />Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan, with structural BMPs if ISR <br />U- ENO -PW <br />exceeds 12 %; AND <br />BACK -PW <br />12% ISR for all other non - residential uses outside of Commercial and /or Commercial - Industrial Nodes as <br />designated in the Land Use Element of the Comprehensive Plan <br />;AND <br />on -site infiltration of the first inch of stormwater runoff; AND <br />A limit of 1,151 acres of non - residential use throughout U- ENO -PW (5.0 %) and 163 acres throughout BACK -PW <br />(1%). [11, [21 <br />50% ISR for all fire stations and solid waste collection centers; AND <br />12% ISR for all other non - residential uses; AND <br />HYCO -PW <br />on -site infiltration of the first inch of stormwater runoff-AND <br />FLAT -PW <br />limit of 1% of the watershed for non - residential use (37 acres in HYCO -PW, 66 acres in FLAT -PW). <br />f11 f71 DRADc nnnnnt ho i ised +n satisfy watershed impervieus iiraGe r n +c <br />70% impervious surface, with structural BMPs required when impervious surface exceeds: <br />L- ENO -PW <br />24% (w/ curb and gutter); or <br />36% (w /o curb and gutter). [11, [21 <br />HAW -PW <br />24% impervious surface limit. <br />JORDAN- <br />[1], [21 DnnDs , n+ ho usod. +n satisfy watershed i 66IFfaGe r +� <br />PW <br />[I BMP's as mandated <br />by the StArmwater <br />f11 Allowable impervious surface area may be modified in accordance with Section 4.2.8 of the UDO. <br />121 For non - residential developments a stormwater feature /best management practice (BMP) shall be required in accordance with <br />applicable local and State standards based on proposed land disturbance and /or a project exceeding impervious surface <br />thresholds as identified herein. <br />NOTE: Non - residential use impervious acreage limits in watershed with such limits are calculated using the actual amount of <br />impervious surface for non - residential uses throughout the watershed, not by the overall number of acres of non - residential <br />parcels located in a particular watershed. <br />6 Unlike residential development, State regulations require a stormwater feature for all non - residential projects <br />exceeding established impervious surface thresholds for the watershed protection overlay district in which the <br />Orange County, North Carolina — Unified Development Ordinance Page 4 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.