Browse
Search
Agenda - 05-26-2015 - C-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:01:40 AM
Creation date
5/18/2015 4:06:44 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-3
Document Relationships
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br />A typical ground mounted array is approximately 7 to 9 feet in height, with approximately 2 to 3 feet <br />of ground clearance, and 47 feet in length. Approximately 20 acres of the site will be initially <br />disturbed with 11.5 acres containing the actual array. A 6 foot high chain link security fence, <br />topped with 3 strand barbed wire, shall enclose the perimeter of the array to prevent access. <br />Vehicular access to the site is restricted by a 24 foot access gate off of White Cross Road. As <br />detailed on the site plan (included in Attachment 1 on Sheet C -1001) the White Cross Volunteer Fire <br />Department and Orange County EMS shall be provided a key to access the site in the event of an <br />emergency. Gravel paths /drives will be installed around these arrays in order to permit access by <br />White Cross LLC technicians to service the panels and inverters. <br />Staff has determined that the applicant is required, per Section 6.8.6F of the UDO, to adhere to <br />a Type D 50 foot wide landscaped buffer around the perimeter of the project. The Type D <br />landscape buffer requires 17 -20 trees and 50 -70 shrubs per 100' feet of buffer length. This is a <br />rate that ensures an opaque screen of at least 20' in height within 3 -5 growing seasons. The <br />applicant is proposing to meet landscaping requirements through the preservation of existing <br />foliage and a planted mix of evergreen and hardwood trees and shrubs. As detailed on Sheet <br />C1001 of the site plan, areas within the 50 foot buffer that are cleared shall be replaced in <br />accordance with applicable Orange County and State guidelines with drought tolerant, <br />indigenous, non - invasive vegetation. The applicant is also proposing to save additional trees <br />between the 50 foot wide buffer and the fencing for the solar array. <br />The applicant is not proposing to develop a business or other similar occupied office facilities on <br />the property. As a result there is no septic or well system proposed, or required, as part of the <br />project. <br />Ordinance Requirements — Class A Special Use: In accordance with Section 5.9.6 (C) (2) Solar <br />Arrays of the UDO, the project is required to demonstrate compliance with the following <br />standards of evaluation: <br />(a) All on -site utility and transmission lines shall, to the extent feasible, be placed <br />underground. <br />STAFF COMMENT. Based on language provided on the site plan the applicant is <br />proposing to adhere to this requirement. <br />(b) The height of proposed arrays and support structures shall not exceed 40 feet. <br />STAFF COMMENT. Data on the submitted site plan, specifically the typical rack <br />height elevation, indicates the height of the racks will be approximately 7 to 8 feet <br />from ground elevation. <br />No other support structures, other than utility poles, are proposed. <br />(c) Individual arrays /solar panels shall be designed and located in order to prevent <br />reflective glare toward any inhabited buildings on adjacent properties as well as <br />adjacent street rights -of -way. <br />STAFF COMMENT. Detail in the application narrative indicates the applicant will <br />comply with this provision. <br />(d) A clearly visible warning sign concerning voltage must be placed at the base of all <br />pad- mounted transformers and substations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.