Orange County NC Website
21 <br />Department of Environmental Management or Orange County Department <br />of Environmental Health? N/A <br />4. Is a septic tank system proposed which as a design capacity of more than <br />3000 gallons per day? <br />If yes, describe No septic systems are proposed for this project. <br />Has an application for a non-discharge permit been submitted to the NC <br />Department of Environmental Management or Orange County Department <br />of Environmental Health? N/A <br />5. Does the activity involve sludge disposal? No <br />If yes, where is the source of the sludge? N/A <br />Describe where and how the sludge is being disposed. <br />N/A <br />Has a NPDES permit from the NC Division of Environmental <br />Management been issued? N/A <br />6. Water Usage: N/A <br />a. Estimated no. of employees x 25 gpd = gpd <br />b. Estimated water use for climate control = gpd <br />c. Process water: <br />% consumed <br />% discharged to septic system <br />% discharged to surface (including storm sewers) <br />(describe: ) <br />% evaporated <br />% reclaimed/reused <br />% other <br />100% <br />d. Water used for cooling, heating, etc., in association with production or <br />manufacturing <br />% reused <br />