Orange County NC Website
19 <br />result of this project. At the completion of construction, the entire site will <br />be seeded to create a good stand of grass. <br />The typical construction schedule for these standard farms is <br />approximately three months. Energy generated by the farm will be <br />distributed to Duke Energy customers. <br />2. Number of lots: 0 <br />3. Number of structures: 0 <br />4. Estimated square footage of area to be graded for development of attached <br />residential units (excluding roads, but including parking areas): 0 <br />5. Estimated square footage of area to be graded for non-residential use <br />(excluding roads) Approx. 4,000 sf (Inverter Pad areas) <br />6. Estimated area to be graded for roads <br />7. Road Type: Public N/A Private <br />Class A N/A <br />Class B N/A <br />8. Hours of operation for commercial or industrial use: <br />The solar farm will operate year round and generate electricity duri ng <br />daylight hours. The facility will be monitored remotely. Security and <br />minimum maintenance are the only periodic activities anticipated. Daily <br />operation does not require permanent on-site employees. <br />B. State Permits Required: <br />1. Does the project involve the mining of earth products? <br />If so, how many cubic feet of material are expected to be excavated? <br />No — N/A <br />Has an application for a Mining Permit been submitted to NCDRCD? <br />N/A ___ <br />