Browse
Search
Agenda - 05-26-2015 - C-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:01:40 AM
Creation date
5/18/2015 4:06:44 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-3
Document Relationships
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />result of this project. At the completion of construction, the entire site will <br />be seeded to create a good stand of grass. <br />The typical construction schedule for these standard farms is <br />approximately three months. Energy generated by the farm will be <br />distributed to Duke Energy customers. <br />2. Number of lots: 0 <br />3. Number of structures: 0 <br />4. Estimated square footage of area to be graded for development of attached <br />residential units (excluding roads, but including parking areas): 0 <br />5. Estimated square footage of area to be graded for non-residential use <br />(excluding roads) Approx. 4,000 sf (Inverter Pad areas) <br />6. Estimated area to be graded for roads <br />7. Road Type: Public N/A Private <br />Class A N/A <br />Class B N/A <br />8. Hours of operation for commercial or industrial use: <br />The solar farm will operate year round and generate electricity duri ng <br />daylight hours. The facility will be monitored remotely. Security and <br />minimum maintenance are the only periodic activities anticipated. Daily <br />operation does not require permanent on-site employees. <br />B. State Permits Required: <br />1. Does the project involve the mining of earth products? <br />If so, how many cubic feet of material are expected to be excavated? <br />No — N/A <br />Has an application for a Mining Permit been submitted to NCDRCD? <br />N/A ___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.