Orange County NC Website
3 <br />Conditional Zoning (CZ) Process: The process involves the approval of a rezoning petition and <br />a site plan allowing for the development of a specific land use on a parcel of property. <br />Applications are processed in a legislative manner (i.e. does not require sworn testimony or <br />evidence) and decisions are based on the BOCC's determination that the project is consistent <br />with the purpose and intent of the Comprehensive Plan. <br />Development Process, Schedule, and Action: The typical cadence for the review of a CZ <br />application is: <br />• First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). <br />Staff Comment — DONE. This meeting was held on April 8, 2015. A synopsis <br />of comments from this meeting is contained within Attachment 4. <br />• Second Action — The BOCC and Planning Board review the application at 1 of 4 <br />joint Quarterly Public Hearings. <br />Staff Comment — The public hearing is scheduled for May 26, 2015. Supporting <br />documentation was not ready for the project to be presented at the February 19, <br />2015 Quarterly Public Hearing, which was cancelled due to weather. <br />• Third Action — The Planning Board makes a recommendation on the proposal. <br />Staff Comment — The Planning Board is slated to review this item at its July <br />2015 regular meeting. <br />• Fourth Action — The BOCC receives the Planning Board recommendation and <br />makes a decision. <br />Staff Comment — Staff anticipates the BOCC receiving this item at its <br />September 1, 2015 regular meeting for final action. <br />Per Section 2.9.2 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part <br />this process only if they address: <br />1. The compatibility of the proposed development with surrounding property, <br />2. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and <br />vehicular circulation systems, screening and buffer areas, etc.) and /or <br />3. All other matters the County may find appropriate or the petitioner may propose. <br />If approved, the Zoning Atlas will be amended and the zoning designation of the property shall <br />be changed to MPD -CZ. It should be noted this change will not exempt the property from <br />complying with applicable overlay district standards (i.e. watershed or flood hazard). <br />Development of the property, specifically allowable land uses, will be in accordance with the <br />newly created zoning district in accordance with the approved site plan and any imposed <br />conditions. <br />The applicant shall be required to submit a final site plan in accordance within Section 2.5 of the <br />UDO. This is so staff can verify all imposed conditions are adhered to and allow for final peer <br />review by members of the Development Advisory Committee (DAC) as detailed within Section <br />1.9 of the UDO. There is no additional site plan review fee assessed to the applicant. <br />