Orange County NC Website
Orange County Solid - Management <br />4' <br />— 6' 6' 0" -----� 6' + <br />ing <br />Dumpster Pad Design Requirements: <br />standard <br />6or8 <br />cubic yard <br />dumpsters <br />24'0" min. <br />`A A <br />�6'0" <br />16' 6' <br />R <br />267 <br />C <br />0 <br />in <br />0 <br />N <br />• Pads shall be constructed from concrete with a minimum compressive strength of 3,500 PSI. <br />® Pad and approach (measured 25' from back of pad) shall be a minimum of 8" thick. <br />O 2 concrete - filled 6" I.D. steel pipe bollards shall be placed as shown on the detail above and shall be set <br />in concrete footings to a minimum depth of 2'. <br />All pads shall be screened /enclosed on 3 sides (sides, back) and shall meet the requirements <br />designated by the jurisdiction (as to materials, height). <br />O If gates are to be installed on the front, they shall be equipped with retainers to hold the gates in the <br />open and closed position and shall be installed in such a manner as to provide a minimum clear <br />opening width of 12' for each dumpster (exclusive of mounting hardware). <br />® Unless alternate arrangements have been made and approved for the recycling of corrugated <br />cardboard, 1 dumpster shall be designated for corrugated cardboard and 1 for solid waste. <br />® The.number of mixed - recyclable carts to be used shall be determined by the proposed use and as <br />agreed upon at the time the formal request for service is made to Orange County Community Recycling <br />by the owner /Applicant. <br />