Orange County NC Website
Page 2 of 7 <br />261 <br />1. Site Preparation Wastes (landclearing, demolition, deconstruction) <br />During site preparation for a project the amount of waste destined for a construction waste landfill or an inert debris <br />landfill should be minimized or diverted for reuse or recycling. Many materials can be reused, recycled, or salvaged, <br />provided that materials are kept separate. This approach may also reduce overall project waste disposal costs. Regulated <br />Recyclable Materials (clean wood waste, scrap metal and corrugated cardboard) generated in Orange County <br />must be recycled. led. During demolition activities, metal and wood are often not "reasonably possible to separate" or doing <br />so may present health and safety concerns (asbestos, lead paint, etc.). In these cases only, are regulated materials not <br />required to be separated for recycling. Consider whether the following materials will be generated on this project, in any <br />uanti , and indicate the management method(s). <br />No asphalt wastes will be produced (proceed to # 4 <br />No aaareaate materials will be removed from the site (proceed to # 5) 1 <br />Recycled at asphalt-paving producer <br />Used on or off site. Describe use: <br />Disposed in an approved landfill (Orange County Landfill charges no tipfee if clean) <br />Other (specify): <br />No aaareaate materials will be removed from the site (proceed to # 5) 1 <br />Recycled as scrap at an aggregate roducer <br />Used on or off site: Describe use: <br />Construction and demolition debris landfill C &D <br />Landclearing and inert debris landfill LCID <br />