Browse
Search
Agenda - 05-26-2015 - C-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:12:19 AM
Creation date
5/18/2015 2:40:09 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-2
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
254 <br />during the construction of the system who shall be responsible for certifying <br />compliance of the installation with approved plans and specifications. A contract with <br />a soil scientist for installation supervision may also be required. <br />The certifying engineer shall provide record plans and specifications (one copy to <br />LHD and one copy to OSWP Central office) along with the certification which shall <br />bear his /her professional engineer's seal. <br />The engineer shall complete an operation and maintenance manual including O and M <br />materials provided by the appropriate equipment suppliers and submit to the owner and <br />proposed Operator in Responsible Charge (ORC). <br />19. The Operation Permit may be issued by the LHD when: <br />The installation has been properly certified by the certifying professional engineer, and <br />record plans and specifications have been furnished. <br />The installation is determined to be complete by the LHD based upon field inspection, <br />including final landscaping, seeding and mulching, provisions for proper system <br />maintenance and monitoring (e.g. any groundwater monitoring wells) are in place, a <br />system Astart-up- inspection has been completed and the system is found to be <br />complete and operational, and the system operation and maintenance manual has been <br />furnished. The OSWP will assist with the LHD's final inspection for all systems <br />containing advanced pretreatment components (e.g. tertiary treatment plants) or <br />complex distribution or control components and may assist with other systems upon <br />request. <br />All necessary legal documents have been properly executed and recorded, including <br />the tri -party agreement (when applicable) and any required easements, and <br />documentation is provided that the owner has executed a contract with an ORC who is <br />duly certified by the Water Pollution Control System Operators Certification <br />Commission to operate and maintain this system. <br />All other conditions of the improvement permit and Authorization to Construct it have <br />been met. <br />Time lines established for OSWP review activities are subject to variation depending on staff <br />shortages and project - specific circumstances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.