Orange County NC Website
250 <br />10. Improvement Permit Issuance: <br />LHD issues improvement permit, after confirming OSWP approval of revised site plan and <br />layout, and legal documents have been properly drafted, and when necessary, executed and <br />recorded. <br />b. The Improvement Permit shall include as conditions: <br />required modifications to be made to the site, and statement that the permit remains <br />valid only if the proposed facility served and the site otherwise remain unchanged <br />statement that the Authorization to Construct shall not be issued until required site <br />modifications have been completed and engineering plans and specifications have been <br />approved by OSWP <br />other conditions determined to be necessary by the LHD <br />SYSTEM ENGINEERING DESIGN APPROVAL AND ISSUANCE OF <br />AUTHORIZATION TO CONSTRUCT <br />11. Applicant and /or Engineer is encouraged to request a pre- design conference with the OSWP <br />Central office engineering staff to discuss design options, receive updated rules and guidance <br />documents, review procedures and projected time frames. LHD and OSWP Regional Staff may attend <br />upon request by any party. <br />12. Applicant's Engineer submits engineering design plans, specifications and supporting calculations <br />(submit two copies to LHD, or as locally requested, and three copies to OSWP Central office) <br />a. The North Carolina Registered Professional Engineer's seal shall appear on all plan sheets and <br />the first page of specifications and calculations. <br />b. The design must be in accordance with applicable rules, guidelines, and recognized principles <br />and practices of engineering and public health. <br />C. The design must incorporate and be consistent with the approved site plan, system layout and <br />the improvement permit. Facility description and details (e.g.: floor plans) shall be submitted <br />(one copy to LHD and one copy to OSWP) as needed to confirm compatibility with previously <br />submitted information. <br />13. Specifications must include: <br />® Description of all materials and equipment to be used, manufacturer's cut sheets, <br />pump curves, etc. <br />® Project- specific construction methods, installation, testing and start -up procedures <br />o Means for assuring the quality and integrity of the finished product <br />0 Specific operations and maintenance procedures, including requirements for system <br />7 <br />