Browse
Search
Agenda - 05-26-2015 - C-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:12:19 AM
Creation date
5/18/2015 2:40:09 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-2
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
249 <br />Draft legal documents for systems to be under joint or multiple ownership or control, <br />including easements, association documents, and draft tri -party agreement, as <br />appropriate <br />Existing component inspection /assessment reporting, if applicable, identifying any <br />needed repairs /modifications (item 4, above) <br />b. OSWP Central office forwards copies to Regional Staff and other agencies as necessary. <br />® OSWP Central office compiles review comments from other divisions /agencies and <br />distributes as appropriate. <br />® OSWP Central office engineering staff reviews site loading capacity and assessment <br />of groundwater impacts. <br />® OSWP Central office engineering staff forward to OSWP Regional Soil Specialist <br />comments pertaining to proposed drainfield /repair field layout and on any other <br />siting /location /monitoring issues related to existing and proposed system components. <br />C. OSWP Regional Soil Specialist evaluates adequacy of all submittals required above. <br />Site evaluation reports prepared by applicant's soil scientist and LHD (field work <br />should be scheduled to be done concurrent with applicant's soil scientist =s and LHD =s <br />field work whenever possible) shall be reviewed. Any further field work or analyses <br />needed by the applicant's soil scientist or LHD shall be identified in writing. <br />Acceptability of proposed drainfields and repair fields layout, proposed continued use, <br />repair or modification of any existing system components, and prospective <br />groundwater monitoring requirements shall be reviewed with LHD and OSWP Central <br />Office staff input. <br />OSWP Regional Soil Specialist recommends approval or denial, or identifies any <br />modifications or additional information needed prior to approval of revised site plan <br />and layout. Interim site /layout issues and revisions shall be directed by the Applicant's <br />consultants to the OSWP Regional Soil Specialist. Three copies of the finally revised <br />site plan and system layout shall be provided to the OSWP - Central office, which shall <br />provide copies stamped "Approved by the OSWP" to the local health department and <br />to the Applicant's engineer, and notify the Applicant of OSWP Approval. <br />[OSWP- Central office shall acknowledge receipt of site information package and identify incomplete items <br />found during a cursory review within 10 working days of receipt. Response shall be given by the OSWP <br />Regional Soil Specialist within 35 working days of receipt of complete information after determined to be <br />complete. Revisions, modifications, and additional information shall be responded to within 15 working days. <br />Submittal packages shall be returned to the applicant after 60 days, if package remains incomplete or if <br />comments have not yet been responded to.]* <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.