Orange County NC Website
249 <br />Draft legal documents for systems to be under joint or multiple ownership or control, <br />including easements, association documents, and draft tri -party agreement, as <br />appropriate <br />Existing component inspection /assessment reporting, if applicable, identifying any <br />needed repairs /modifications (item 4, above) <br />b. OSWP Central office forwards copies to Regional Staff and other agencies as necessary. <br />® OSWP Central office compiles review comments from other divisions /agencies and <br />distributes as appropriate. <br />® OSWP Central office engineering staff reviews site loading capacity and assessment <br />of groundwater impacts. <br />® OSWP Central office engineering staff forward to OSWP Regional Soil Specialist <br />comments pertaining to proposed drainfield /repair field layout and on any other <br />siting /location /monitoring issues related to existing and proposed system components. <br />C. OSWP Regional Soil Specialist evaluates adequacy of all submittals required above. <br />Site evaluation reports prepared by applicant's soil scientist and LHD (field work <br />should be scheduled to be done concurrent with applicant's soil scientist =s and LHD =s <br />field work whenever possible) shall be reviewed. Any further field work or analyses <br />needed by the applicant's soil scientist or LHD shall be identified in writing. <br />Acceptability of proposed drainfields and repair fields layout, proposed continued use, <br />repair or modification of any existing system components, and prospective <br />groundwater monitoring requirements shall be reviewed with LHD and OSWP Central <br />Office staff input. <br />OSWP Regional Soil Specialist recommends approval or denial, or identifies any <br />modifications or additional information needed prior to approval of revised site plan <br />and layout. Interim site /layout issues and revisions shall be directed by the Applicant's <br />consultants to the OSWP Regional Soil Specialist. Three copies of the finally revised <br />site plan and system layout shall be provided to the OSWP - Central office, which shall <br />provide copies stamped "Approved by the OSWP" to the local health department and <br />to the Applicant's engineer, and notify the Applicant of OSWP Approval. <br />[OSWP- Central office shall acknowledge receipt of site information package and identify incomplete items <br />found during a cursory review within 10 working days of receipt. Response shall be given by the OSWP <br />Regional Soil Specialist within 35 working days of receipt of complete information after determined to be <br />complete. Revisions, modifications, and additional information shall be responded to within 15 working days. <br />Submittal packages shall be returned to the applicant after 60 days, if package remains incomplete or if <br />comments have not yet been responded to.]* <br />0 <br />