Orange County NC Website
210 <br />Conventional Septic System Area Computation <br />Client Name: <br />Number Bedrooms: <br />Design Flow (gal /day): <br />LTAR (gal /day /ft) <br />Trench Bottom Area (ft): <br />Trench Width (ft): <br />On- center distance between trenches (ft): <br />Trench Bottom Length (ft): <br />Minimum Field Area Required (ft): <br />Minimum Field Area Required (Innovative) (ft) <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />Ennis <br />Created by: JV <br />Created on: 6/20/2001 <br />Updated on: 1/12/2014 <br />4 <br />480 (120 gal /day /bedroom, minimum 240 gal /day /dwelling) <br />0.1 <br />4800 (Design flow /LTAR) <br />3 <br />9 <br />1600 <br />14400 (Trench Bottom Length'Trench on- center distance) <br />10800 (25% reduction from above) <br />36000 (Minimum field area'2.5) <br />27000 (25% reduction from above) <br />43200 (Minimum field area'3) <br />32400 (25% reduction from above) <br />(1) Provides for reserve area and soil irregularity, 2.5 to 3 is multiplier. <br />Client Name: Ennis <br />Number Bedrooms: <br />Design Flow (gal /day): <br />LTAR (gal /day /ft) <br />Trench Bottom Area (ft): <br />Trench Width (ft): <br />On- center distance between trenches (ft): <br />Trench Bottom Length (ft): <br />Minimum Field Area Required (ft): <br />Minimum Field Area Required (Innovative) (ft) <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />4 <br />480 (120 gal /day /bedroom, minimum 240 gal /day /dwelling) <br />0.4 <br />1200 (Design flow /LTAR) <br />3 <br />9 <br />400 <br />3600 (Trench Bottom Length'Trench on- center distance) <br />2700 (25% reduction from above) <br />9000 (Minimum field area'2.5) <br />6750 (25% reduction from above) <br />10800 (Minimum field area'3) <br />8100 (25% reduction from above) <br />(1) Provides for reserve area and soil irregularity, 2.5 to 3 is multiplier. <br />Client Name: Ennis <br />Number Bedrooms: <br />Design Flow (gal /day): <br />LTAR (gal /day /ft) <br />Trench Bottom Area (ft): <br />Trench Width (ft): <br />On- center distance between trenches (ft): <br />Trench Bottom Length (ft): <br />Minimum Field Area Required (ft): <br />Minimum Field Area Required (Innovative) (ft) <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />Total Field Area Required (ft)('): <br />Total Field Area Required (Innovative) (ft)('): <br />4 <br />480 (120 gal /day /bedroom, minimum 240 gal /day /dwelling) <br />0.25 <br />1920 (Design flow /LTAR) <br />3 <br />9 <br />640 <br />5760 (Trench Bottom Length'Trench on- center distance) <br />4320 (25% reduction from above) <br />14400 (Minimum field area'2.5) <br />10800 (25% reduction from above) <br />17280 (Minimum field area'3) <br />12960 (25% reduction from above) <br />(1) Provides for reserve area and soil irregularity, 2.5 to 3 is multiplier. <br />