Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60 <br /> Water bars are usually installed after regular use of the forest road or skid trail has elided. <br /> A high relief water bar(three feet or greater in height) will serve as a deterrent for normal <br /> vehicle traffic. Water bars should be stabilized with grass seeding/mulching or volunteer <br /> growth at the time of project closeout. Armoring the water bars with crushed stone should <br /> be considered under circumstances of steep grades and highly erodible soils. After the <br /> tract is closed and before vegetation has fully re-colonized and stabilized the water bar, it <br /> is important to check in periodically to be certain a major storm flow event has not <br /> damaged the water bar and rendered it nonfunctional. <br /> • ` Bars <br /> -Yff11fM�dfff - - . <br /> 7f•80' <br /> �N��� <br /> i <br /> No 0-jilm No Ooliol <br /> Broad-based Dips <br /> As its name implies, a broad-based dip is a broad earthen dip-hump combination built <br /> into the surface of a flat or insloped access road. The dip forms a reverse or outsloped <br /> cross-drain to divert flowing water from one side of the roadway to the other. This <br /> structure is usually applied to haul roads with slopes less than 12%. The dip is preferred <br /> over the water bar as it allows truck traffic to maintain a fairly uniform speed traversing <br /> the tract as opposed to the stop and go, "speed bump" characteristics of the water bars. A <br /> broad-based dip is not a substitute stream crossing method but rather a method to control <br /> transport of water from a paralleling road should ditch on one side of the road to the <br /> other. Slope of the land again dictates the spacing of this BMP as follows; <br /> Road Grade(%)) Broad-Based Dip Spacing <br /> 2-4 200-300 <br /> 5-7 160-190 <br /> 8-10 140-150 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.