Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> VI. Public Road Access: <br /> The UDO requires the property have access from an existing public road and that such access <br /> be in compliance with any and all public road access management plans adopted by Orange <br /> County. Staff has determined the project complies. <br /> VII. Additional Standards: <br /> Per Section 5.8.4 (a) (3) (n) of the UDO the following additional standards are required: <br /> i. For non-charter public schools, the minimum lot size shall be as required by the <br /> adopted School Construction Standards, as amended from time to time by the Board <br /> of County Commissioners, the Orange County Board of Education and the Chapel <br /> Hill-Carrboro Board of Education. <br /> ii. For all schools, the lot size shall be adequate to accommodate all activities. The <br /> proposed methods to handle the maximum number of participants and patrons for any <br /> single event shall be provided while also adhering to safe vehicular and pedestrian <br /> circulation. <br /> Staff Comment. Staff believes the lot(s) are of sufficient size to accommodate the <br /> proposed project based on the maximum number of anticipated students as detailed <br /> by the applicant. <br /> iii. Negative visual impacts shall be minimized along any major roadway. Negative visual <br /> impacts include, but are not limited to, loading/unloading areas, delivery areas, air <br /> handling units (roof top and other), parking areas for machinery, and storage <br /> buildings. Appropriate screening methods shall be used to enhance the aesthetic <br /> value of a project. <br /> Staff Comment. Staff is satisfied that the applicant can adhere to this requirement. <br /> iv. Transportation improvements as deemed necessary by the Traffic Impact Analysis. <br /> Staff Comment: As previously indicated, the Traffic Impact Analysis does not indicate <br /> such requirements are necessary. <br /> v. Site Access: <br /> (a) There shall be a minimum of two access points to the site. <br /> (b) Access points shall separate student drop-off areas and visitor parking from <br /> bus traffic. <br /> (c) If school buses are used, then at least one access shall be limited to school <br /> employee and bus use during normal school hours. <br /> (d) All access points shall be located to provide maximum visibility and safety. <br /> (e) No driveway shall be permitted in a location that will hinder or congest traffic <br /> movement on a public street. <br /> Staff Comment: The applicant is showing the required access points to the property <br /> off of New Jericho Road. Internal circulation segregates student drop-off/pick-up <br /> traffic from visitor or staff traffic. As there is no proposed use of school buses, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.