Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:20:29 AM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
504 Meadowland Drive <br />Hillsborough, NC 27278 <br />Location: 6211 New Jericho Road (SR 1899) off of Millhouse Road (SR 1725). <br />Refer to Attachment 2 for a vicinity map of the project. <br />Parcel Information: a. <br />PIN(s): 9871- 64 -7391; 9871 -64 -5632; 9871 -65 -8140; 9871 -74- <br />3098; and 9871 -72 -1935. Please refer to Attachment 2 for a <br />copy of a vicinity map detailing the subject parcels. <br />b. <br />Size of parcel(s): The school is located on an approximately 54 <br />acre campus on 5 separate parcels of property. <br />c. <br />Zoning of parcel(s): Rural Buffer (RB). <br />d. <br />Township: Chapel Hill. <br />e. <br />Future Land Use Map Designation: Rural Buffer. <br />f. <br />Growth Management System Designation: Rural. <br />g. <br />Existing Conditions /Physical Features: The properties have <br />previously been developed to support the school operation as <br />well as an existing daycare operation operating under an existing <br />Class B Special Use Permit. <br />There is an existing mixture of woodland and open space <br />throughout the campus. <br />The school currently operates under a `de- facto' Class A Special <br />Use Permit in accordance with Section 8.6 of the UDO. <br />h. <br />Roads: Vehicular access to the parcel is off of New Jericho <br />Road, a State maintained roadway. <br />Surrounding Land Uses: a. NORTH: Single- family residential with RB zoning on lots ranging <br />from 4.5 to 20 acres in size; <br />b. SOUTH: Millhouse Road; Property owned by the applicant, <br />specifically an open field supporting athletic activities zoned RB; <br />c. EAST: Undeveloped property zoned RB; railroad tracks and <br />Interstate 40; Property owned by the applicant supporting the septic <br />facility for the school; and <br />d. WEST: Single- family residential zoned RB ranging from 4 to 10 <br />acres in size; Spence's Farm camp /retreat center operating under a <br />previously issued Class B Special Use Permit; the Heartwood <br />single - family residential subdivision zoned PDH -R1 with lots ranging <br />from 0.5 to 1.5 acres in size. <br />Proposal: As detailed within Attachment 1, the applicant is requesting to modify and expand the <br />existing campus. Part of their request is to have the County approve a Master Plan detailing the <br />construction and location of new buildings and support facilities over the next 15- years. The <br />plans are envisioned to support an increase in student population to approximately 350 students <br />by 2030. Currently the school has 259 students enrolled. If the request is approved, the school <br />is expected to see an increase of 91 students over the next 15 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.