Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
160 <br /> Emerson Waldorf School <br /> April 8,2015 <br /> Page 2 <br /> The Early Childhood and High School share the same loading area.During the AM High School <br /> student loading begins 20 minutes before Early Childhood.During the PM,Early Childhood <br /> dismisses at 12:30 and the remaining grades dismiss at 3:15.Adequate parking is provided near <br /> the Early Childhood location. <br /> School policy requires 1 —4 Grade parents to park and walk their student into the school <br /> building.During the AM student loading time,the school provides coffee and a covered area <br /> near this parking lot for these parents to socialize. This activity will have parents parking for a <br /> longer time period indicating a higher need for parking. Similar schools have 43%to 67%of the <br /> parents bring their child to school in the AM equating to 50 to 77 vehicles. The Revised Site Plan <br /> provides 29 parking spaces. It is questionable if the school is providing adequate parking for this <br /> activity.If this becomes a traffic safety concern,the school can take corrective measures.A <br /> separate access lane is provided from Driveway 4 to this parking lot allowing access to other <br /> student loading areas.During the PM student loading time, similar schools are expected to have <br /> 18 parents waiting before dismissal. <br /> The Revised Site Plan indicates Driveway 2 and Driveway 3 have gates. It is our understanding <br /> these driveways will be closed during the AM and PM student loading times to prevent parents <br /> from circumventing the intended student loading process. <br /> We appreciate the opportunity to serve Emerson Waldorf School and hope you find our services <br /> helpful as together we continue to provide "Safe Roads to Safe Schools." <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.